Tenderskhoj
India
- Transportation
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of 95 Sq.mm (cable Colour Black 200 Meter) Single Core, Thin-walled Flexible Elastomeric Cables With Copper Conductors, Electron-beam Irradiation Cross Linked/chemical Curing Processed, For Working Voltages Above 750 Volts Upto 1.8/3.0kv Suitablefo
27 May 2024
Uttar Pradesh Work Of Annual Maintenance Contract (amc) Of Faiveley Make Axle Mounted Disc Brake System Of Lhb Coaches During Ss-ii & Ss- Iii Schedules At Rcnk/jhansi.
Estimated Cost :26969773 INR
08 Jun 2024
India Unloading And Loading Along With Shifting, Disconnecting, Connecting And Testing Of Various Type Of Battery Sets Of Ac And Non Ac Coaches As Per Detailed Scope Of Work.qty: As Per Schedule Of Work.
08 Jun 2024
Assam Stripping Of Cbc From Lhb Coaches Including Dismantling Of Components Along With Cleaning, Transportation From And To Coach And Stacking Of Components At Designated Place And Cleaning, Movement And Stacking Of Air Brake Components Of All Types Of Coaches
Estimated Cost :1750260 INR
08 Jun 2024
West Bengal Supply Of Press Fit Ms3v Type Micro Switch Of 2a, 250 V, 1no+1nc, Suitable For Fitment And Application On Eaton (formerly As Bussman) Make 1000a/1000 Volts Fuse Type 170m8610/170l9609 Fitted In Compact Design Of Uprated Silicon Rectifier For Ac Single Pha
27 May 2024
Gujarat Supply Of Knuckle For Aar-h Type Cbc Coupler Of Dellner Make As Per Dellner Part No. 1020210. Conforming To Rdso Spec. No. Rdso/2011/cg-03 Rev. 3. Only Oem Or Its India Distributor To Participate And Supply. [ Warranty Period: 84 Months After The Date Of
27 May 2024
Delhi Repair Maintenance Operation Fire Fighting Equipments, Afas & Pa System At Ahq Vayu Bhawan. (#1 Providing Services For Operation Of Notifier Make Addressable Fire Alarm System And Supplying And Fixing Of Fire Accessories At Ahq Vayu Bhawan).
Estimated Cost :595272 INR
24 May 2024
Maharashtra Request For Proposal For Engagement Of Consultant For Periodic Compliances, Advisory & Legal Services Relating To Goods & Service Tax (gst).
14 Jun 2024
Uttar Pradesh Replacement Of 33kv Isolator & Jaw, Various Work Of Business Plan 2024-25 In Area Edd Nakur Sre.
Estimated Cost :196000 INR
22 May 2024
Punjab Proposal Of System, One Time Squarebunker-zone3
20 May 2024