Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Haryana Gudana Block: Dadri-ii Panchayat: Gudana Dist.: Annual Mtc. Work For Water Supply 1 Electrical Items/ Copper Wire Prov And Fixing 10 Sq.mm 3 Core Flat Cables Of Finolex, Polycab, Ecao And Bunton (capacity Of Motor 22kw To 36 Kw) /10sqm Mm 3 Core Flate Cab
Estimated Cost :8500 INR
10 Jun 2024
Uttar Pradesh Procurement Of Erw Pipe For Fly Ash Line.
14 Jun 2024
Bihar Construction Of Storm Water Drainage System For Bodhgaya Nagar Parishad Area, Bodhgaya, Bihar Under Atmanirbhar Bihar Saat Nischay-2.
Estimated Cost :773392100 INR
09 Jul 2024
Telangana 1) Supply, Delivery And Pipe Line Strengthening Work Including Installation Of Valves And Chambers For Egytable Water Supply With Laying Of 200/150mm Dia Providing By-pass Arrangements At 2000kl Capacity Elsr In Uppal Bhagayath Phase I Under O&m Division.
Estimated Cost :40040000 INR
19 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Electrical Items/ Sub Mersible Motor Cable Providing And Fixing Of 6 Mm Sq Submersible Cable 3 Core Complete In All Respect. /6 Sqmm / Nuh Town
2 Electrical Items/ Sub Mersible Motor Cable Providing And Fixi

Estimated Cost :49250 INR
10 Jun 2024
Haryana Badrai Block: Badhra Panchayat: Badrai Dist.: Annual Mtc. Work For Water Supply 1 Electrical Items/ Starter Oil P/f Starter Oil Complete In All Respect /starter Oil / Badrai Twell No 4 Ltrs. 4 2 Electrical Items/ Copper Wire P/f Copper Wire 7x16 Complete
Estimated Cost :16560 INR
10 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Pipes / Pvc Pipe 6kgf P/f Pvc Pipe 150mm Supreme Complete In All Respect /150mm / Nuh Town
2 Pipes / Pvc Pipe 6kgf Providing And Fixing 100 Mm Pvc Pipe 6kg Pressure Isi Marks /100 Mm / Nuh Town
3 Pipes

Estimated Cost :49300 INR
10 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Outsourcing Of Works/ Supply Of Water Tankers Standing Of Water Tanker Full Day And Night (24
4000 Ltrs. / (standing) Tanker 4000 Ltrs. Mustard Procurement At Bithwana Mandi Rewari. Date Of The :- 08.04.2024

Estimated Cost :12000 INR
10 Jun 2024
Maharashtra Repair Overhauling Service - Forklift Tata Eco Vehicle; Tata; Yes; Buyer Premises
Qty : 1

Estimated Cost :35000 INR
10 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Outsourcing Of Works/ Hiring Of Jcb Hire Charges Of Jcb With Fuel And Driver For Excavation And Other Job Works /hiring Of Jcb Per Hour Basis / Nuh Town
2 Outsourcing Of Works/ Hiring Of Hammer Machine Hirin

Estimated Cost :48800 INR
10 Jun 2024