Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Jammu & Kashmir Stage Contract For Maintenance Of Roads And Bridges For The Year 2024-25, Under The Territorial Jurisdiction Of Sub-division-ii Of Rnb Karnnagar Division.
Estimated Cost :500000 INR
07 May 2024
Gujarat Stage Contract For Maintenance Of Roads And Bridges For The Year 2024-25, Under The Territorial Jurisdiction Of Sub-division-i Of Rnb Karnnagar Division.
Estimated Cost :400000 INR
07 May 2024
Haryana Raising Of Existing Rob 145-a, 164-a & 167-a On Ldh-jhl Section Of Ambala Division For Facilitating The Movement Of The Double Stack Container.
Estimated Cost :300959000 INR
24 May 2024
Madhya Pradesh Construction Of Railway Portion Of Four Lane Road Over Bridge (1 X 36.00 M Composite Girder) At Km. 500/13 - 14 In Lieu Of Level Crossing No. 254 'x' In Ratlam - Khandwa Section, In Rajendra Nagar Yard Between Rajendra Nagar - Rau Stations Of Division Wes
Estimated Cost :82683533 INR
23 May 2024
India Balance Work Of Earthwork In Formation In Embankment/cutting, Side Drain, Trolley Refuges, Prepared Sub Grade, Blanketing Etc.
Construction Of Balance Minor Bridge, Side Drain, Protection Work Including Allied Work.

Estimated Cost :265786000 INR
20 May 2024
India Carrying Out Geotechnical Studies, Preparation Of Construction Of With Lhs & Preparing Detailed Drawings & Design In Connection With Lieu Of Existing Lc No. 269 In At Km 304/5-6 Jjn-rsh Section.
Estimated Cost :4378775 INR
23 May 2024
India Carrying Out Geotechnical Studies, Preparation Of Construction Of With Lhs & Preparing Detailed Drawings & Design In Connection With Lieu Of Existing Lc No. 269 In At Km 304/5-6 Jjn-rsh Section.
Estimated Cost :4378775 INR
23 May 2024
Andhra Pradesh Following Civil Engineering Works: 1.dismantling Of Defective Fob At Vm-1 (els) Under Aden/myd/wat And 2. Dismantling Of Defective Fob At Rcc Fob At Ss-1 (km.871/1-2) Under Aden/myd/wat.
Estimated Cost :4931164 INR
23 May 2024
Uttar Pradesh Supply Of Elwb, Elwb Transporation, Elwb Approch Road, Elwb Misc, Elwb Amc - Elwb For Central Warehouse Bislpur. Qty : 12
Estimated Cost :1670880 INR
29 May 2024
Telangana Provision Towards Modification To The Existing Ohe Arrangements In Connection With Proposed Construction Of Rub (4-lane) @ Km. 175 At Sanatnagar Station Yard Approaches Towards Secunderabad End.2. Sc-wadi Section-proposed Rebuilding Of " Road Under Bridge
Estimated Cost :10187649 INR
23 May 2024