Tenderskhoj
India
- Industry Fire Safety and Security
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of Safety Strap For Brake Beam Outer To Icfs Drg No: Emu/m/3-2-046 Col Ii Alt. C/7 For Use In Mc & Hcc Coaches. (note: Alternate Steel As Per Is 2062/92-fe 410 Wc May Be Used In Lieu Of Irs M41-97 As Indicated In Relevant Drg. Itself)
Safety

20 May 2024
Karnataka Supply Of Basic Electronics Kit, Electronics Kit, Electronics Kit For Creativity, Sensor Kit, Iot Kit Introduction To Iot Based Projects Using Arduino Nano, Smart Robot Car Kit, Rover Kit, Complete Soldering Kit, Gardening Equipments, Portable Welding Mac
29 Jun 2024
Bihar Supply Of Kit For Speed Sensor Rcf Part No.790040267, Ftil Consists Of (i) Single Speed Sensor 2000 Mm Length, (ii) Hose 1680 Mm Lg Sae 100r6 (iii) Fitting For Speed Sensor Cabling (i)1/604496/200a-01no. (ii)040705100-01no.(iii)790040315-01no.
Kit F

08 May 2024
Odisha Supply Of 6u Rack, 8 Port Poe Switch, 16 Port Poe Switch, 24 Port Poe Switch, 2 Mp Dome Ip Camera, 2 Mp Bullet Ip Camera, 16 Ch Nvr, 32 Ch Nvr, 64 Ch Nvr, 6 Tb Surveillance Hard Drive, Cat 6 Copper Cable, Laying Of Utp Cable, Fixing Of Camera, 55 Inch Sma
10 May 2024
Punjab Supply Of Set Of Non-metallic Pipe (smoke Detector)
Set Of Non-metallic Pipe (smoke Detector) To Spec.no Clw/es/3/0254/b, Drawing As Per Set List El29230020 Rev-0, And Str No.clw/2016/eldo/e/str/0025 Rev-'0'. [ Warranty Period: 30 Months After The D

08 May 2024
Madhya Pradesh Complete Body Denting, Painting And Necessary Repairing Work Of Water Tender And Foam Tender Of Sstpp, Mppgcl, Dongalia
Estimated Cost :392940
09 May 2024
Uttar Pradesh Providing Of Sulphur Transportation Work.
14 May 2024
Haryana Supply Of Gear Box, Gear Box With Motor, Geared Motor, Flexible Power Cable Pvc Insulated, Mechanical Seal For Pump, Etc.
10 May 2024
Maharashtra Providing Fire Alarm, Extinguishers And Pa System For Proposed Evm Vvpat Storage Godown At Shitole, Tal-pen, Dist
Estimated Cost :1220786 INR
09 May 2024
Tamilnadu Annual Maintenance Contract (amc) For Fire Fighting Lines Pertaining 16 Dia Tower Monitor Line, 14 Dia Fire Hydrant Lines From Old Pump House To Bd-i And From New Pump House To Bd-i And Also New Pump House To M/s. Ioc, Foreshore Terminal At Oil Dock For
24 May 2024