Tenderskhoj
India
- Defence
LOCATION SUMMARY DEADLINE
Gujarat Supply Of Biometric Identification Equipment (q3) Qty : 20
11 May 2024
Karnataka Supply Of Elevator Rubber Belt
Elevator Rubber Belt For Cleaning / Peening Machine-2. To Size 350 To 356 Mm Width X 17830 Mm Length X 13 To 15 Mm Thick, To Is 1891 Pt-1 - 6 Plies.note: Warranty: 12 Months From The Date Of Fitment Or 18 Months From T

15 May 2024
Andhra Pradesh Repair Overhauling Service - Rate Contract For Implementation Of Change Management Towards Installation Of Ats Onboard In Vessels; Any Other Suitable Brand; No; Buyer Premises Qty : 1
31 May 2024
Andhra Pradesh Supply Of Matches Safety (n0442-0010571) (q3), Bottle Water Tumbler For Water Bottle Patt No 101 (n0451- 0000101) (q3), Polythene Film Length 112'' Width 18'' Thk 0 007'' (n0461-4638373) (q3), Aerosol Dispenser Plastic Nett Content Of Each Aerosol Dispe (
11 May 2024
Goa General Election To The Lok Sabha Election 2024 Of Goa - Set Up Of The Static Surveillance Booth At Bicholim.
13 May 2024
Mizoram Supply Of Target Tin Sheet Figure 11, Target Paper Figure 11, Target Tin Sheet Figure 12, Target Tin Sheet Cqb, Target Paper Cqb, Target Wooden 4x4, Measuring Disc, Cloth Red, Cloth Yellow, Cloth Green, Nail All Size - Target Items Qty : 363
30 May 2024
Maharashtra Bid For - Repair Rate Contract Rrc For Repair Maintenance Of Integrated Navigtion System Fitted Onboard Ins Deepak Qty : 1
30 May 2024
Andhra Pradesh Supply Of Anchor Link
Anchor Link Conforming To Icf/md/spec.no.-311,rev.nil. To Icf Drg No : T-0-7- 603, Col - I, Alt : B / 15 [ Warranty Period: 30 Months After The Date Of Delivery ]

20 May 2024
Karnataka Supply Of Environmental Test Chamber, Hot Air Oven, Hot Air Oven, Hot Air Oven Walk In Type, Climatic Chamber, Hot Air Oven 145 64, Hot Air Oven Cmei-839, Hot Air Oven M 58 3, Hot Air Oven 634, Hot Air Oven 340 76, Data Acquisition System, Digital Program
30 May 2024
Haryana Supply, Installation, Integration, Commissioning, Operations And Maintenance Of City-wide Cctv Based Public Safety And Adaptive Traffic Management System-phase-2
29 May 2024