Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
West Bengal Provision Of Waiting Hall At Bwcn, Psf & Srbz Stations In Bqa-msae Station.2) Improvement Of Drainage At Lc No. Br-43 And Lhs No. 260b, 263a & 285a In Adra Division.3)standardisation Of Level Crossing By Shifting Gate Barrier, Improvement Of Visibility, R
Estimated Cost :52026374 INR
15 Jul 2024
Andhra Pradesh Execution Of P.way Linking Works Along With Supply, Stacking And Spreading Of Machine Crushed Hard Stone Ballast For Diversion Of Down Kk Line In Connection With Development Of Proposed New Block Station At Km 277.030 Between Ambagaon-amagura For Regulati
Estimated Cost :13148405 INR
16 Jul 2024
Karnataka Supply And Supervision Of Replacement Of Hydraulic Cylinder Seal Kits For Cd 250 Series Of Wt3
Estimated Cost :149642 INR
08 Jul 2024
India Conducting Final Location Survey, Including Collection Of Field Details For Geotechnical Investigation, Preparation Of Gads & Other Drawings And Preparation Of Survey Report & Estimate Etc For The Work Of (i) Flyover Between Uslapur - Dadhapara (17.875 Km
Estimated Cost :43811604 INR
16 Jul 2024
India Supply Of Proposed New Bg Line Between Tindivanam - Nagari Via. Walajah Road (184.45 Km) - Providing Consultancy Services And Preparation Of Gad And Detailed Design And Drawing For Sub Structure And Super Structure For Proposed Rob/rub Between Tindivanam
16 Jul 2024
India Dismantling/demolishing Of Existing Old Rob No.215 And Including Other Ancillary Civil Work In Jamalpur Yard, Construction Of Side Pathway Of Br. No. 130 (1x76.2m Open Web Girder + 2x24.4m Composite Girder) Dn Line Between Kahalgaon And Ekchari Under The
Estimated Cost :14402855 INR
16 Jul 2024
West Bengal Welding Of Rail Joints By Alumino Thermit Skv Process Including Supply Of Welding Portion And Supervision Under The Jurisdiction Of Senior Divisional Engineer/iii/.
Estimated Cost :5351758 INR
16 Jul 2024
Jharkhand Comprehensive Annual Maintenance Contract Of Electronic Interlocking Systems Make- M/s Medha Servo Drives Pvt. Ltd, Hyderabad At 02 Station I.e Bondamunda-link-b, Kiriburu Of Chakradharpur Division For A Period Of 03 Years.
Estimated Cost :6246965 INR
12 Jul 2024
West Bengal Supply Of Injector Assy, Cr Brg Cell, Piston Ring, Fuel Filter, Oil Filter, Piston Assy, Sleeve Cylinder Assy, Stop Solenoid
Qty : 19

13 Jul 2024
India Comprehensive Annual Maintenance Contract Of Ufsbi (deltron Make) Installed In Sonpur Division Of E.c. Railway For 3 Years.
Estimated Cost :11144870 INR
05 Jul 2024