Tenderskhoj
India
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
West Bengal Construction Of Cc Road From Krishna Barmans House To Goutam Barmans House And Fatik Barmans House To Ajit Barmans House At Sansad Viii Under Dbhgp.
Estimated Cost :275703 INR
13 Jun 2024
Telangana Supply Of Hy7142299916 Stud With 2 Nuts M33x3x350 (q3), Hy7142299363 Stud 2 Nuts M36x3x350 (q3) Qty : 372
10 Jun 2024
Telangana Supply Of Soiling, Asphalt Work, Deco Turf 8 Layer Cushion System, Line Marking, Pole Gear System, Drainage, Flood Lights, Wall, Digital Electronic Score Board 3ft X 4ft Including Installation, Chain Link Fencing - Construction Of Volleyball Court. Qty :
29 Jun 2024
Maharashtra Carrying Out Structural Repair And Allied Civil Work.
Carrying Out Special Repair Work By Providing Chemical Treatment To Rcc Members And Allied Civil Work Including Internal And External Painting.
Dismantling Deteriorated Rcc Chajjas, Providi

Estimated Cost :26350284 INR
29 Jun 2024
Jammu & Kashmir Construction Of Culture Center Consisting Of Main Building Basement Ground Floor Plus 3 And Auditorium Building Basement Ground Plus 1 Including Development Works I E Internal Road With Footpath External Sewerage, Water Supply Storm Water Drain Rain Water
Estimated Cost :474085 INR
13 Jun 2024
Jammu & Kashmir Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Mahore On Emergency Basis (i.e) By Way Of Clearance Of Snow/slips Likely To Occur During Financial Year 2024-25 Total Length 28.500 Kms
17 Jun 2024
West Bengal Construction Of Cc Road From Pucca Road Towards The House Of Shyamal Roy At Sansad Ii Under Dbhgp.
Estimated Cost :345193 INR
13 Jun 2024
Uttar Pradesh Road Improvement Work By Cc In Room Number-46, In The Lane In Front Of Transformer Near Tal Mangaleshwar Temple From 26/221 To 26/206 And In The Lane 26/202 Under Loha Mandi Zone
Estimated Cost :176140 INR
14 Jun 2024
Kerala General Rm 2023-24 Cluster Ii Phase 1 Zone I One Year Running Contract For Various Roads Under Pwd Road Section Kayamkulam In District 5 Road Stretches For A Length Of 23.68 Km.
General Civil Work.

Estimated Cost :1728778 INR
15 Jun 2024
Haryana Strengthening With 30mm Bc, Relaying Of Ccb And Reconstruction Of One No Bridge On Bal Rangran To Anchla Road Road Id 7343 Length 4.820 Km In Assandh Constituency In Karnal District.
Estimated Cost :35620105 INR
27 Jun 2024