Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Madhya Pradesh Construction Of Subway In Lieu Of L33c No. 34 (km: 49/21-23)by Inserting Relieving Girder And Laying The Box(es) By Pushing The Box Below The Relieving Girder
Estimated Cost :73482988 INR
18 Jul 2024
Andhra Pradesh Proposed Construction Of 2-lane Rob At Rly Km 62/3-4 Between Kalasamudram And Kadiri Stations In Dmm-pak Section (ii)proposed Construction Of 2-lane Rob Of 60 M Bow String Girder And Subway (5.5x3.5) In Lieu Of Lc No. 67 At Km. 109/5-6 Between Mulakalache
Estimated Cost :4114482 INR
17 Jul 2024
Karnataka Construction Of 3m Wide Foot Over Bridge [fob] For Crossing Of Two Tracks In Sisvinhalli(svhe) Yard In Ubl-gdg Section. (maintenance Period=06 Months)
Estimated Cost :19170356 INR
19 Jul 2024
Andhra Pradesh Supply, Installation And Instrumentation, 3d Monitoring Of 17 Nos. Of Single Line Tunnels Of Total Length 20, 060m Approximately Between Shivalingapuram And Borraguhalu Stations Km. 45.483 To Km. 72.550 Of Division, East Coast Railway.
Estimated Cost :123208597 INR
25 Jul 2024
West Bengal Work In Connection With Construction Of Limited Height Subway ( By Box Push Method) In Lieu Of Level Crossing No. 26 At Km. 53/11-12 Between Mayp - Ambg In She - Gogt Section In Howrah Division.
Estimated Cost :1713401 INR
18 Jul 2024
Bihar Provision Of 3.00 Metre Wide Fob With Ramp For Divyagjan At Karhiya Station Under Aden/bxr.
Estimated Cost :21011293 INR
16 Jul 2024
Gujarat Construction Of Vented Causeway At Baroi Sadau Luni Road Ch 1/000, 1/150, 5/200 And 6/100 Ta Mundra Dist.
05 Jul 2024
Chhattisgarh Construction Of Rob At Level Crossing No.bk-66 (railway Portion Only) At Km. 883/11-13 Between Buhrar-amlai Section Under The Jurisdiction Of Assistant Divisional Engineer Of Division.
Estimated Cost :136387669 INR
22 Jul 2024
Maharashtra Miscellaneous Repair Works Of Station Fob In Snrd-mnkd (harbour Line) Section (24 Fobs).
Estimated Cost :9446118 INR
26 Jul 2024
Maharashtra Miscellaneous Repair Works Of Station Fob In Csmt-cla (main Line) Section (23 Fobs).
Estimated Cost :9658103 INR
26 Jul 2024