Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
India Construction Of Railway Portion Of Four Lane Road Over Bridge.
Estimated Cost :82683533 INR
23 May 2024
Madhya Pradesh Construction Of Road Over Bridge In Lieu Of Lc No : 27 At Km 1051/1-2 In Saugor – Makroniya Section And Construction Of Road Over Bridge In Lieu Of Lc No 32 At Km/ 1059/2-3 In Makroniya – Lidhora Section And Construction Of Road Over Bridge In Lieu Of Lc
27 May 2024
West Bengal Dtx-koj & Fkm-dbb Repairs To Damaged Portion Works And Dredging Of Silt Of 05 Nos. Major Bridges I.e. 305/435, 298/429, 296/427, 292/420 & 282/407 In Dtx-koj And 16 Nos. Major/minor Bridges I.e. 2, 3, 4, 4a, 5, 5a, 6, 7, 8, 14, 20, 26, 29, 33, 35 & 37 In
Estimated Cost :93109730 INR
29 May 2024
India S & T Work In Connection With Rebuilding Of 13 Nos. Stone Bridge Between Rourkela - Jharsuguda Section.
Estimated Cost :4312394 INR
27 May 2024
Andhra Pradesh Annual Zonal Contract : Repairs And Maintenance Of Works From Chinnaganjam (exclusive) To Krishna Bridge (exclusive) In Aden/bpp Jurisdiction For The Period From 1.7.2024 To 30.6.2025. Sw-ii : Annual Zonal Contract: Repairs And Maintenance Of Works From V
Estimated Cost :15602205 INR
27 May 2024
Andhra Pradesh Ya-ndl Section: Elimination Of Level Crossing No.18 At Railway Km. 111/9-10 Between Yerraguntla-proddutur Stations And Diversion Of Traffic Through Road Under Bridge No.477 At Railway Km.111/5-6 Between Yerraguntla-proddutur Stations.
Estimated Cost :12766281 INR
27 May 2024
Maharashtra Provision Of Rubs Maintenance Under Aden/awb, Aden/j And Aden/pau Jurisdictions.
Estimated Cost :8989973 INR
27 May 2024
Maharashtra Earthwork In Embankment & Cutting, Construction Of Minor Bridges (including Rubs), Side Drains & Catchwater Drains And P-way Work (track Linking) & Ballast Supply In The Kalamb-yavatmal Section From Ch. 40700 To Ch. 78200 [excluding Tunnel Approach From C
Estimated Cost :1546325716 INR
27 May 2024
Sikkim Construction Of 140m Span Steel Walkway Steel Foot Bridge 2 Tonne Capacity Along With All Civil Work Across The Teesta River Near Power House Area, Teesta Vi H E Project Sikkim
Estimated Cost :48805784 INR
20 May 2024
India Carrying Out Geotechnical Studies, Preparation Of Construction Of With Lhs & Preparing Detailed Drawings & Design In Connection With Lieu Of Existing Lc No.93 Awr-re Section.
Estimated Cost :4378775 INR
27 May 2024