Tenderskhoj
India
- Industry Minerals and Metals
LOCATION SUMMARY DEADLINE
Jharkhand Construction Of Gravel Packed Tube Well Of 300x125mm Dia X60mtr (a.v) Depth Complete ( By Mechanical Rotary Rig Machine With Mud Pump Mounted On Truck) And D.t.h Rig Machine With Installation Of India Mark-ii Hand Pump With Drain, Platform.
26 Jun 2024
Gujarat Supply Of Wild - Life Cages (q3)
Qty : 2

03 Jul 2024
Gujarat Control Room Repairing/maintenance, Construction Of Water Sump, Septic Tank, Soak Pit, Rcc Road And Ancillary Civil Works At 66kv Dhrangadhra Ss Under Dhrangadhra Tr Div & Toilet Block Repairing At 220kv Dhrangadhra Tr Division Office Of Tr Circle.
Estimated Cost :2975866 INR
10 Jul 2024
Gujarat Water Augmentation At Jaspur With (1) Construction Of Syphon At Ch. 244.69 Km. On Narmada Main Canal At Jaspur With E&m Work, Raw Water Pipeline From Syphon To Rwps At Jaspur, Rwps At Jaspur Head Work, 75 Mld Water Treatment Plant And Clear Water Sump & P
15 Jul 2024
Karnataka Testing And Certification Of Tools & Tackles, Pressure Vessels In Rtps Plant
Estimated Cost :1968777 INR
02 Jul 2024
Jharkhand Construction Of Gravel Packed Tube Well Of 300x125mm Dia X60mtr (a.v) Depth Complete ( By Mechanical Rotary Rig Machine With Mud Pump Mounted On Truck) And D.t.h Rig Machine With Installation Of India Mark-ii Hand Pump With Drain, Platform.
26 Jun 2024
Haryana Construction Of Draining Nala 2paploha Iron Shed 3 Naggal Rutal Street Khera Baba 4 Bhuwana Street And R/wall Vangy 2024.
Estimated Cost :1126669 INR
24 Jun 2024
Jharkhand Construction Of Kitchen Cum Store In Upgraded Middle School, Barhabad, Panchayat- Kolajoda, Block
05 Jul 2024
Rajasthan Supply Of Construction Material For The Works Of All The Schemes Of Rural Development And Panchayati Raj, Mussoorie, Ghadla/kankar/jhajhra, Mortar-soil/mud Masala, Lime From Kali Kiln For Lime Masonry Work, Cement, P.p.c., White Cement, Fine Aggregate, Sa
Estimated Cost :5039562 INR
01 Jul 2024
India Auction Sale Of Boulder Auction Dt. 20.06.2024, Bf Grade Scrap, Bf/sa/1106/1 65-300 Boulder Scrap (lf) Including Dust, Stock+arising, Customers Need To Ensure Continuous Lifting Of Material Already Available At Yard On Daily Basis Complete The Dispatch Wi
22 Jun 2024