Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Independent Engineer Services During Operation Maintenance Period For (i) Nagpur-wainganga Bridge Section Of Nh-53 On Bot (toll) Under And (ii) Chhattisgarh-maharashtra Border - Wainganga Bridge Section Of Nh-53 On Bot Basis In Maharashtra
04 Jul 2024
Maharashtra Construction Of Major Bridges (br. 66, 72 & 78), Rob At Vasai, Vehicle Subway (br. 71), Minor Bridges (br. 79, 79a), Drain (ch: 54836 To Ch: 55336) & Earthwork In Formation (ch: 38850 To Ch: 39750 & Ch: 53300 To Ch: 55750) In The Section Between Borivali
19 Jul 2024
West Bengal Conversion Of Border Security Fencing From Phase Ii/iii To New Design Fence In West Bengal Between Bp No. 243/mp To 764/2-s (length 210.028 Km).
In Various Stretches From Bp. No. 355/2-s To 357/1-s (4.725 Km), 361/m To 365/m (6.329 Km), 385/2-s To 3

Estimated Cost :433710 INR
11 Jun 2024
West Bengal Conversion Of Border Security Fencing From Phase Ii/iii To New Design Fence In West Bengal Between Bp. No. 243/mp To 764/2-s (length 210.028 Km) Sh In Various Stretches From Bp. No. 355/2-s To 357/1-s (4.725 Km), 361/m To 365/m (6.329 Km), 385/2-s To 385/
Estimated Cost :227534 INR
11 Jun 2024
Bihar Construction Of Additional 3-lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh-922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode (2nd Call)
Estimated Cost :4441800000
11 Jun 2024
Assam Maintance Of Bailey Bridge No 26, Paint Og Make Berger Oblique Asian, Paint White Make Berger Oblique Asian, Turpentine Oil, Paint Brush 4 Inches, Unskilled Labour, Skilled Labour - Maint Of Bailey Bridge No 26 Qty : 383
Estimated Cost :500000 INR
25 Jun 2024
Chhattisgarh Construction Of 05 Bridges.
Estimated Cost :223012000 INR
11 Jun 2024
Nagaland Short Term Maintenance Contract For Construction Of Foot-over Bridges On Nh-29 In The Dimapur-kohima Road Pkg.-iii At 4 Locations Old Chainages 153.900, 156.490, 160.830 And 161.250 In The State Of Nagaland
Estimated Cost :78307160 INR
29 Jun 2024
Kerala General-total Station Survey And Soil Investigation Work For The Construction Of New Road Connecting The Approach Roads Of Kannakkanthuruthu And Arulappanthurthu Bridges .-investigation Work.
Estimated Cost :135282 INR
11 Jun 2024
Kerala General-premonsoon Works 2024-various Bridges Under Section No.1 Kollam.
Estimated Cost :55774 INR
10 Jun 2024