Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Himachal Pradesh Construction Of Balance Work Of Banon To Tharu And Gehra Road Km. 00 To 4500.
Formation Cutting 5/7 Mtr. Wide, Rwalls, Bwalls, X-drainage Work, R.c.c. Slab Culvert And Unlined Drain) Under Ridf-xxvi

28 Jun 2024
Haryana Construction Of Rain Water Harvesting In Govt School At Village Kheri Gujran Block Faridabad Distt Faridabad ( Ps)
Estimated Cost :214430 INR
27 Jun 2024
Himachal Pradesh Dnit For The Construction Of Iti Building At Chirgaon Rohru Distt
Construction Of Bld. Portion Ws And Si Rain Water Harvesting Tank Septic Tank And Site Development Etc

27 Jun 2024
Haryana Installation Of Pipeline Moga 152700 Right Fatehabad Distributery At Village- Bhirdana Block- Fatehabad Dist.- Fatehabad Dplan (re-tender)
Estimated Cost :672509 INR
26 Jun 2024
Tamilnadu Construction Of Storm Water Drain And Approach Road Work At Stp Site Valampurivillai.
27 Jun 2024
Haryana Repair Of Nala Kesar To Gurnaam Singh At Village Bhurangpur , Panchyat Samithi Construction Of Pulia Near F/o Jaswant And Ram Singh At Village Bhurangpur Block Ambala 1
Estimated Cost :153863 INR
27 Jun 2024
Karnataka Supply Of M16x80 Csk Head Cap Screw (full Thread) Is 1364/67 - 2002, Gr 12 9 Make: Tvs, Boltmaster, Lps, Gkw, Unbr, M16 Hex Nut Gr 8 As Per Is 1364/67-2002 Make: Tvs/boltmaster/unbrako/lps/gkw, M24x120 Cfht Half Thread Hex Head Bolt Gr-8 8, Is: 1364/67-20
11 Jul 2024
West Bengal Sinking Of Mark Ii Tubewell At Palashboni, Mouza-ladadihi, J.l. No-53 Under Junbedia Gram Panchayat Of Bankura-ii Panchayat Samity, Dist-bankura.
Estimated Cost :102230 INR
01 Jul 2024
West Bengal Operation Of Iep By Operating The Sluice Valve Connection With Iep & Blower Back Washing Of Iep For Starting The Inner Materials Of Blower Compressor Maintenance & Back Washing The Same & Operating Of Sluice Valve Where Necy. To Fill In The Rcc Reservoir
Estimated Cost :833016 INR
26 Jun 2024
Tamilnadu Road Work
Providing Side Drain And Service Road By Using Paver Block For The Work Of Construction Of Rob At Km 147_8 Of Nh 47 (madurai_kanniyakumari Section) In Lieu Lc No 18 Of Railway Km 27_500-600 Between Tirunelveli Junction And Yard In Tirunelv

09 Jul 2024