Tenderskhoj
India
- Transportation
LOCATION SUMMARY DEADLINE
Maharashtra Procurement Of Spares For Reciprocating Air Compressor.
Work Of Overhauling And Servicing Of Bhel Make Vm 12 Ht Vacuum Breaker.
Procurement Of Heavy Duty Bearing Housing & Labyrinth Seal Ring.
Repair Of Various Conveyor Pulley Of Coal Co

Estimated Cost :6810000 INR
13 Jul 2024
Uttar Pradesh Interlocking Work
Estimated Cost :461900 INR
04 Jul 2024
Madhya Pradesh Repair / Maintenance Of The Rural Roads/cds For Five Years, Constructed Under Pradhan Mantri Gram Sadak Yojna And Other Scheme- Post 5 Year
Estimated Cost :9740384 INR
15 Jul 2024
Chhattisgarh Supply Of Casseter For Neuntral Insert Tool Set
Casseter For Neuntral Insert Tool Set, Set Consisting Of (1) Lef Tunrning Partnnon 6939318710 Of Widia Size 191940 Make Or Eqvt, Qty:01 No (2) Right Tunrning Partnnon 6939318820 Of Widia Size 191940 Ma

10 Jul 2024
Uttar Pradesh Supply Of Fire Suit, Ba Set, Safety Helmet, Safety Shoes, Safety Belt Double Lanyard, Reflective Jacket, A Fff Form, Multipurpose Branch, Foam Making Branch 5x, Search Light Torch, Gumboot, Electric Gloves, Extension Ladder, Rope, Falls Arrester, Walkie T
Estimated Cost :2427340 INR
15 Jul 2024
Madhya Pradesh Repair / Maintenance Of The Rural Roads/cds For Five Years, Constructed Under Pradhan Mantri Gram Sadak Yojna And Other Scheme- Post 5 Year
Estimated Cost :25468874 INR
15 Jul 2024
India Provision Of Safety Fencing Along The Track In Connection With Raising Of Speed 130 Kmph Under Sr.den/i/r (bilaspur-durg Section) Total Length 272.587 Kms.
Estimated Cost :1107708204 INR
15 Jul 2024
Karnataka Supply And Installation Of Shrouded Type Busbars As Per Annexure-a. [ Warranty Period: 30 Months After The Date Of Delivery ]
10 Jul 2024
West Bengal Supply Of Fuel Filter For Common Rail Part No. Dv8.072.01.0.00 Suitable For 500kva, 750v Dg Set, Make: Kirloskar Oil Engines Ltd. (koel) For Lhb Power Car. [ Warranty Period: 6 Months After The Date Of Delivery ]
08 Jul 2024
Madhya Pradesh Repair / Maintenance Of The Rural Roads/cds For Five Years, Constructed Under Pradhan Mantri Gram Sadak Yojna And Other Scheme- Post 15 Year
Estimated Cost :19471003 INR
15 Jul 2024