Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Kerala Investigation Estimate For The Condition Survey Of Bridges Under Payyanur -1 Bridges Section-.-investigation Work.
Estimated Cost :211847 INR
10 Jun 2024
India Construction Of Fob With Stair For Pedestrian ( Grade Separator ) At Km: 758/5 In Between Jia-gae Stations.
Estimated Cost :47500000 INR
24 Jun 2024
Uttar Pradesh Seepage Protection And Dewatering Work In Connection With Elimination Of Level Crossing By Road Under Bridge At Various (29 Nos.) Lhs In Ddu-pryj, Pryj-cnb, Car-cpu & Nyn- Mkp Section Of Pryj Division.
Estimated Cost :10763226 INR
24 Jun 2024
India Earthwork In Cutting And Filling, Blanketing, Construction Of Minor Bridges, Major Bridges, Rub, Rob, Retaining Wall, Level Crossing, Side Drain, Catch Water Drain, P. Way Work And Other Ancillary Works In Between Kalipahari To Jurisdiction Of Asansol Div
Estimated Cost :9475732247 INR
12 Jul 2024
India Earthwork In Cutting And Filling, Blanketing, Construction Of Minor Bridges, Major Bridges, Ror, Rub, Rob, Retaining Wall, Level Crossing, Side Drain, Catch Water Drain, P Way Work And Other Ancillary Works In Between Kalipahari To Andal Including Yard Fr
Estimated Cost :3024271032 INR
05 Jul 2024
West Bengal Earthwork In Cutting And Filling, Blanketing,construction Of Minor Bridges, Major Bridges, Rub, Rob, Retaining Wall, Level Crossing, Side Drain, Catch Water Drain, P. Way Work And Other Ancillary Works In Between Kalipahari To Upto Asansol Divisin Includi
Estimated Cost :9475732247 INR
12 Jul 2024
Odisha Through Bridge Channel Sleeper Renewal Of Existing 578 Nos. Channel Sleepers With New "h' Beam Sleepers Over Br. No. 559 (up & Dn) Between Cuttack -bhubaneswar Section And Renewal Of Chequered Plate On Br No. 22up Between Barang - Rajathgarh Section Of Kh
Estimated Cost :27310819 INR
21 Jun 2024
Delhi Maintenance Of Completed Scheme Of Nazul A/c -ii Under Swz.
Maintenance Of Prasad Nagar Lake (water Body) At Karol Bagh, Delhi By Excavating And Removing Mud And Silt Deposited In Dry/wet And/or Submerged Under Water Condition.

Estimated Cost :2828736
05 Jun 2024
Andhra Pradesh Scr Construction Organization: Engineering, Procurement And Construction (epc) Contract For Proposed Doubling Of Track Including, Signal & Electrical General Service Works Between Diguvametta & Gazulapalli (19.77km Excluding Bogada Tunnel: Km.219.00- Km.2
Estimated Cost :1827067592 INR
14 Aug 2024
Kerala Earth Work, Minor Bridges In Kumbalam And Turavur.
Construction Of Bridge No.2 Shoranpur Jn- Vallathol Nagar.

Estimated Cost :421915000 INR
14 Jun 2024