Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of Set Of Bearing Brackets
Set Of Bearing Brackets For Tm Type Hs-15250a. (02 Items, 02 Nos) (i) Bearing Bracket Assembly Pe As Per Drg.no 10q 750-245, Alt- 'o' Or Latest (ii) Bearing Bracket Assembly Ce As Per Drg.no 10q 750-246,alt- 'p' Or

18 Jun 2024
Himachal Pradesh Providing Of Manpower Outsourcing Services - Minimum Wage - Unskilled; Others; Watch Ward Qty : 2
12 Jun 2024
Uttar Pradesh Supply Of Bolt M 18x70
Hex Head Bolt With Nut M 18x70 Steel For Side Bearer As Per Is: 1367 Grade 8.8 Make Lps, Gkw, Unbrako [ Warranty Period: 30 Months After The Date Of Delivery ]

02 Jul 2024
Uttar Pradesh Supply Of Rubber Packing
Rubber Packing For Radiator To Mvrh Duct As Per Drg.no.elw/bsl/4/f-95.006 Alt.2. [ Warranty Period: 30 Months After The Date Of Delivery ]

19 Jul 2024
Madhya Pradesh Providing Of Nvr, Camera, Switch, Harddisk, Connector, Box, Cable, Rack, Monitor, Service - Cctv Cameras Installation With Accessories Qty : 115
Estimated Cost :1000000 INR
24 Jun 2024
Uttar Pradesh Supply Of Pin Irs M4 Cl1 To Clw
Pin Irs M4 Cl1 To Clw Drg No.01/4/25/5/alt-6 For Tm.nose Suspension Assembly. [ Warranty Period: 30 Months After The Date Of Delivery ]

14 Jun 2024
West Bengal Supply Of L -type Composite Brake Block Etc.
L Type Composition Brake Block For Electric Locomotives,as Per Rdso Drg No, Sk.dp-3650 Alt-1 & Rdso Specn. No-mp.0.01.00.04(rev-10) March 2021 [ Warranty Period: 30 Months After The Date Of Delivery ]

01 Jul 2024
West Bengal Supply Of Bogie Bolster Arrgt.complete For M/coach (modified Bogie)
Bogie Bolster Arrgt.complete For M/coach (modified Bogie) To Icf Drg.no.dmu/dpc-0-4-001,col-ii, Alt.p/8.(small P By 8)& To Icf's Specn.no-icf/md/spec.-147, Rev -02 With Amendment Sl

03 Jul 2024
West Bengal Supply Of Clutch Plate, Pressure Plate, Clutch Release Bearing, Needle Bush, Clutch Disc, Speedometer Head, Hose Pipe, Cylinder Assy, Tapper Roller Bearing - Mt 003 Qty : 14
24 Jun 2024
Madhya Pradesh Drilling Work Of Tube Well.
Complete Work Including Checking Of Water Inflow Capacity, Testing Of Tube Well Water. #hindi Image

Estimated Cost :1596000 INR
08 Jun 2024