Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Uttarakhand Supply Of Led Charging Bulb, Leed Tube Rod, Microtek Inverter 3 Phase 15kva With Battery 150ah Complete, Heat Piller Rod, Heat Piller, Wire 1 5sqmm, Wire2 5sqmm, Wire 4sqmm, Wire 6sqmm, Mcb Box 3tpm 24 Way, Mcb 4 Pole 63 Amp Isolator, Mcb 63 Amp Dp, Mcb 4
Estimated Cost :1900000 INR
24 May 2024
Madhya Pradesh Supply Of Profile Checking Gauge
Profile Checking Gauge (p Valve) With Feeler Gauge For Bull Gear-65 Teeth (mating Pinion-16 Teeth-locos-wag7. Ref.- Drawing No.- Skdl-4373 & Rdso-mp-mi-129/86. Material Tool Steel- Is-3748/90. Hardness-50/55 Hrc 7 Fe

09 May 2024
Andhra Pradesh Supply Of Broom Element For Brm As Per Kershaw Part No:230016
Broom Element For Brm As Per Kershaw Part No:230016, Make:kershaw

13 May 2024
Tamilnadu Supply Of As661 Oh Kit For Auto Drain Valve Gm Type. Kit Consists Of 11 Items
As661 Oh Kit For Auto Drain Valve Gm Type. Kit Consists Of 11 Items (1) Ad1051 Spring Compression Adv, Qty. 01 No/set. (2) Ad707 Piston Poppet Adv, Qty. 02 Nos/set. (3) Ad

17 May 2024
Bihar Supply Of Split Air Conditioner Including Green Ac, Wall Mount Type (q2). Qty : 1
13 May 2024
Maharashtra Supply Of Pair Of Coupling Head
Pair Of Coupling Head Consisting Of 2 Items(1) Coupling Head Pin Type With Gasket To Drg. No. Icf/std-3-5-043 Alt.a Or Latest Item No. 2 And 3 Col-i( For Brake Pipe) (2) Coupling Head Pin Type With Gasket To Drg. No.

13 May 2024
Uttar Pradesh Supply Of Set Of Chemicals For Bio Lab. As Per Ann [set Of Chemicals For Bio Lab. As Per Annexure Attached Here With. ]
Set Of Chemicals For Bio Lab. As Per Annexure Attached Here With.

13 May 2024
Gujarat Providing And Laying Water Distribution Network & Sewerage Network For Kolavda Gamtal (remaining Part) Of Gmc Area.
Estimated Cost :99457277
15 May 2024
Madhya Pradesh Supply Of Fevitite / Araldite Epoxy Adhesive Resin
Fevitite / Araldite Epoxy Adhesive Resin 100 Gms And Hardner 80 Gms Or Equivalent Brand. This Is Shelf Life Item And Should Be Procured With Staggered Delivery Period. Supplier To Mention/print Date

15 May 2024
Punjab Protecting / Strengthning Of River Ravi Edge Of River Ravi In Darya Mansoon Complex By Providing Revetment And Studs At Outfall Of Phulka Nallah For The Year 2023-24 (job No. 4082)
Estimated Cost :45531096 INR
27 May 2024