Tenderskhoj
India
- Industry Cement
LOCATION SUMMARY DEADLINE
Haryana Town : - Estimate For Construction Of Sub Divisional Engineer Residence At Tw No-2 Dc C 1 Miscellaneous Items/ Misc. Items 1. Supplying And Providing Of Tangri River Sand Under Floors Including Watering And Compaction In 25cm Layers, Dressing Etc. Complet
Estimated Cost :47918 INR
05 Jun 2024
Haryana Town : - Estimate For Construction Of Sub Divisional Engineer Residence At Tw No-2 Dc C 1 Miscellaneous Items/ Misc. Items 1. Supplying And Providing Of Tangri River Sand Under Floors Including Watering And Compaction In 25cm Layers, Dressing Etc. Complet
Estimated Cost :48412 INR
05 Jun 2024
Haryana Town : - Estimate For Construction Of Sub Divisional Engineer Residence At Tw No-2 Dc C 1 Miscellaneous Items/ Misc. Items 1. Supplying And Providing Of Tangri River Sand Under Floors Including Watering And Compaction In 25cm Layers, Dressing Etc. Complet
Estimated Cost :48412 INR
05 Jun 2024
Haryana Town : - Estimate For Construction Of Sub Divisional Engineer Residence At Tw No-2 Dc C 1 Miscellaneous Items/ Misc. Items 1. Supplying And Providing Of Tangri River Sand Under Floors Including Watering And Compaction In 25cm Layers, Dressing Etc. Complet
Estimated Cost :48412 INR
05 Jun 2024
Haryana Bhuna Town Annual Mtc. Works For Water Supply 1 Electrical Items/ Copper Wire Less Old Scrap Copper Wire / At Kheri Road Water Works Bhuna Town
2 Electrical Items/ Copper Wire New Cooper Wire / At Kheri Road Water Works Bhuna Town
3 Mot

Estimated Cost :19350 INR
05 Jun 2024
Uttar Pradesh Supply Of 10 Mm Cable, Changeover 10amp, Single Core 1point 5mm Cable, Single Core 1mm Cable, 2 Core 1point 5mm Cable, 2 Poing 5mm 2 Core Cable, Mcb Insulator 2 Pole 63 Amp, Mcb Insulator 2 Pole 42 Amp, Mcb Single 16 Amp, 15 Amp Top, 5 Amp Top, 5 Amp Sock
Estimated Cost :199200 INR
25 Jun 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Outsourcing Of Works/ Hiring Of Hammer Machine Hiring Of Broker For Dismantling Cement Concrete / Hiring Of Broker For Dismantling Cement Concrete / At Uttam Nagar Hisar Town
2 Sewer Related Items/ Desilting O

Estimated Cost :15750 INR
06 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Building Material/ Rcc Cover Slab For Pump Chamber Construction Of Rcc Sleb 4 -0x3 -0x0- 04 With Required Material And Labour Complete In All Respect.3 No. / Construction Of Rcc Slab Including Slab, Cement, Sand,
Estimated Cost :19950 INR
05 Jun 2024
Punjab Supply Of Enamel, Synthetic, Exterior (a) Under Coating (b) Finishing Paint (v2) As Per Is 2932 (q3), Thinner For Epoxy Paints (bhel) (q3). Qty : 160
11 Jun 2024
-Sleeving-Insulation-3/4"-As-Per-Blw-Pl.no.-18530035-And-Drg.-No.-8453681-Alt-b-For-Wdg4/wdp4-Hhp-Locomotives.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]"> Tamilnadu -Sleeving-Insulation-3/4"-As-Per-Blw-Pl.no.-18530035-And-Drg.-No.-8453681-Alt-b-For-Wdg4/wdp4-Hhp-Locomotives.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]">Supply Of Sleeving Insulation-3/4"
Sleeving Insulation-3/4" As Per Blw Pl.no. 18530035 And Drg. No. 8453681 Alt-b For Wdg4/wdp4 Hhp Locomotives. [ Warranty Period: 30 Months After The Date Of Delivery ]

-Sleeving-Insulation-3/4"-As-Per-Blw-Pl.no.-18530035-And-Drg.-No.-8453681-Alt-b-For-Wdg4/wdp4-Hhp-Locomotives.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]">19 Jun 2024