Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Andhra Pradesh Carrying Out Rectification Works Of Ss Gratings In Economiser Ltr And Lts Zones And Providing Of Ss Sleeves For Economiser Tubes At Front And Rear Gratings To Avoid Tube Rubbing Of Units 3 And 4 Boilers During Annual Overhaul Period For The Year 2024 2025
Estimated Cost :1119495 INR
07 Jun 2024
Uttar Pradesh Supply Of Potassium Chloride Solution For 1 41ms Per Cm, Potassium Chloride Solution For 0147ms Per Cm, Buffer Ph 12 At 25degree Centigrade, Ph 9 18 At 25degree Centigrade, Nitrite Standard Solution, Phenol Standard Solution, Sulphate Standard Solution, P
Estimated Cost :1000000 INR
21 Jun 2024
Uttar Pradesh Construction Of Permanent Pump House At Km 11.340 R/s Of Augmentation Canal Including Supply Erction And Commissioning Of 02 No. 5cs Vt Pumps In Village Alahar, Distt. Yamuna Nagar.
Estimated Cost :8905512 INR
07 Jun 2024
Andhra Pradesh Overhaul Works On Boiler Pressure Parts And Conducting Radiography Test During The Annual Overhaul Period For The Year 2024 2025
Estimated Cost :4979021 INR
07 Jun 2024
Madhya Pradesh Two Miscellaneous Works Under Divisional Engineer (north) Jabalpur Jurisdiction: - I.widening Of Cess At Various Locations. Ii.provision Of Drain / Drain Improvement In Connection With Various Track Renewal Work.
Estimated Cost :92137690 INR
25 Jun 2024
Punjab Supply Of Lv7 Maruti, 10454070, 17670m83030, Thermostat, Lv7 Stln, 10326635, 4310-003707 X-7408300, Parts Kit Compressor Unloader Air Dryer, 43 I-43 Akl, 10527289, B-6518537, Delivery Hose 20 Mtrs Long, Lv7 Maruti, 10461469, 43445-60a11, Bush, Lv7 Tata, 1
21 Jun 2024
Andhra Pradesh Overhauling Of Water Wall Soot Blowers Long And Half Retractable Soot Blowers Of Units 3 And 4 Boilers During Annual Overhaul Period For The 2024 2025
Estimated Cost :616518 INR
07 Jun 2024
Rajasthan Watch And Ward At Nagaliya Pick Up Weir, Gagri, Wanjna And Rawatbor Miw During Flood Season For The Year 2024-25
Estimated Cost :733000 INR
07 Jun 2024
India Conversion Of Brake Rigging Of Wag-9 Locomotives From Tbu/pbu Type Brake Rigging To Conventional Brake Rigging. Qty- 04 Set.
Estimated Cost :6752096 INR
25 Jun 2024
Andhra Pradesh Cleaning And Carrying Out D- Meter Survey In The Areas Like Water Circulation Sysetm And Steam Circulation System Of Units 3 And 4 Boilers During The Annual Overhaul Period For The Year 2024 2025
Estimated Cost :534346 INR
07 Jun 2024