Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Mizoram Supply Of Seal Pinion Rear Axle, Bearing Pinion Outer, Bearing Pinion Inner, Kit Drive Gear And Pinion 41x11 Teeth, Gakset Cover, Differential Bearing, Differential Adjust Shim 0 003 Mm, Differential Adjust Shim 0 005 Mm, Shaft Star Pinion, Star Pinion, S
Estimated Cost :500000 INR
04 Jun 2024
Assam Parcel Space In Slr Coach (single Compartment)
Parcel Space In Slr Coach (single Compartment) For A Period Of 03 Years
Parcel Space In Slr Coach (single Compartment).

05 Jun 2024
Maharashtra Arboriculture Services To Arbo Assets At Rnd Estate At Pashan Including Arde Allied Area And Begdewadi Area At Pashan.
04 Jun 2024
Maharashtra Tender For Rate Contract For A Period Of 2 Years For Hiring Of Project Management Consultant (pmc) Services For Steel Pipeline Laying And Associated Works For Cgd Network Of Nashik, Sindhudurg And Ramanagara Ga.
04 Jun 2024
West Bengal Lining Up A Consultant To Carry Out Quantitative Risk Assessment Qra For The Peripheral Pipelines Crossing Boundaries Of Haldia Refinery Qty : 1
Estimated Cost :973500 INR
28 May 2024
Delhi Testing, Checking And Repairing Of 600 Kwp On Grid Solar Generation Plant Of Sonipat Campus, Iit Delhi
Estimated Cost :376500 INR
21 May 2024
Madhya Pradesh Deployment Of Vehicles With Drivers And Labours As Per Annexure Attached -deployment Of One Mini Truck Min-02mt With Driver (and Along With 08 Labours) On Daily Basis As Per Annexure Attached , Deployment Of One Tractor(industrial/commercial) Min-35hp Wit
03 Jun 2024
Rajasthan Supply Of Hex Nipple 40 Bore, As Per Rcf Drawing No.lw63167 Alt C Item No. 12, Mat. & Spec As Per Is:1239(pt-2)-92, Tab-28, Aisi-304, Threads To Iso 7/1, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Tr
21 May 2024
Rajasthan Supply Of Handle Complete Assembly To Icf Drg. No. T-5-6-020 Alt.-m / 37, Item 1 & 2, Finish Nickel Chromium Plating As Per Note 02 Of Drawing No. T-5-6-020 Alt. M / 37 [ Warranty Period: 30 Months After The Date Of Delivery ]
21 May 2024
Gujarat Supply Of Bracket For Bcn Wagon For As Per Drawing No. Wd-84014 S-9 Alt.7 Item No. 5 [ Warranty Period: 30 Months After The Date Of Delivery ]
22 May 2024