Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Andhra Pradesh Proposed Construction Of New Bridges Br No :582(exg 1 X 3.66mrcc Boxes) At Km 695/22-24 To Avoid Water Stagnation Ang Discharging Rainy Water. Sw-ii): Bza Division -bza-vskp Section : Proposed Construction Of New Bridges Br No :587 To Avoid Water Stagnati
Estimated Cost :15355845 INR
18 Jun 2024
Andhra Pradesh Replacement Of Corroded And Over Aged Girders With New Girders On Bridge No 383 Up (3x12.19m) At Km:630/17-21 And 383 Dn (3x12.19m) At Km:630/18-22 Between Slo-pap Stations Of Sse/br/i/rjy Section. Sw-ii: Bza Division: Bza-vskp Section: Replacement Of Ove
Estimated Cost :73711934 INR
18 Jun 2024
Andhra Pradesh Strengthening Of Open Web Girder Bridges (important Bridge No. 3kb West, Major Bridge Nos. 185up, 60dn& 168up) Between Gdr- Bza And Bza-bvrm Stations By Strengthening, Correcting Cross Levels And Longitudinal Levels In Lieu Of Increasing The Section Speed
Estimated Cost :22828911 INR
18 Jun 2024
Uttar Pradesh Contract For Trr(p)= 4.389 T.k.m. & 1.800 T.k.m. In Ddu-bsb-zbd Section, Replacement Of 205 Nos. Steel Channel Sleepers Of Major Br. No. 32 Up (orn-3 Bridge) Of Bsb-zbd Section By H- Beam Steel Sleepers And Replacement Of Conventional Sej (32 Nos.) Laid O
Estimated Cost :18251506 INR
21 Jun 2024
Uttar Pradesh Provision Of Limited Height Subway (lhsw) At Location Between Lc No- 56c And 57c At Km 76/7 Between Sarai Mir- Khorason Road Section And At Lc No 14( Closed) At Km 18/21-23 Between Ghosi- Amila Section.
Estimated Cost :125119910 INR
19 Jun 2024
Uttar Pradesh Widening Of Bridge No. 9 (underpass) At Km 764/13-15 Between Vyn-kei In Lieu Of Widening Of Padav Tengra Mod Road In The Section Of Sse/w/bsb Under Aden/bsb/nr. (deposit Work)
Estimated Cost :194511402 INR
21 Jun 2024
Maharashtra General Repairs, Painting, Etc. For Bridges In The Jurisdiction Of Adennandurbar Between Km. 77.60 To Km.212.482 Between Ukai Songhad (excl.) To Sindkhede (incl.), Zone 14b Ukai-songhad - Jalgaon Sec.
Estimated Cost :6000000 INR
14 Jun 2024
West Bengal Signal & Telecommunication Work In Connection With Provision Of 12 Mtr Wide Fob At Jrle, Dgle And Mgr Station Under Amrit Bharat Station Scheme. (b) S&t Work In Connection With Provision Of 12 Mtr Wide Fob At Godda, Baka, Svrp And Sbo Station Under Amrit
Estimated Cost :17245927 INR
14 Jun 2024
Haryana Work For Providing 1300 Ft Stone Steining U/s And D/s Vr Bridge At Rd10600 Of Chautang Nallah For The Protection Of Agricultural Fields And Abadi Of Village Kottarkhana And Sabilpur Jattan After Flood 2023.
Estimated Cost :4347927 INR
30 May 2024
Karnataka 1) Work Of Track Linking In Tolahunse Yard (phase-ii) Including Annex Building, Construction Of New Hl Pf Of 540 Mtr Length, Extension Of Fob And Minor Bridge, Construction Of New Shelter Etc., 2) Construction Of Loop Lines Including Points & Crossings Fo
Estimated Cost :140632705 INR
14 Jun 2024