Tenderskhoj
India
- Industry Minerals and Metals
LOCATION SUMMARY DEADLINE
Gujarat Supply Of Sand Pipe
Sand Pipe To Drg No Wr-ccg-el/3-pc-009 Ref 1. Alt 4. Specn: 35 3 21 1 Ref 1 [ Warranty Period: 30 Months After The Date Of Delivery ]

01 Jun 2024
Gujarat Supply Of Poh Kit For Dirt Collector
Poh Kit For Dirt Collector Consisting Of Following 2 Items, I) Gasket, Drg. No. Wd-92051-s-05, Alt-5,sheet-ii, Item-4, Qty.1/kit Ii) Washer, Drg. No. Wd-92051-s-05, Alt-5, Sheet-ii, Item-5, Qty. 1/kit Other Techn

31 May 2024
Tamilnadu Supply Of Oil Seal Kit
Oil Seal Kit To Gd Part No. 340wln6010 [ Warranty Period: 30 Months After The Date Of Delivery ]

30 May 2024
Assam Supply Of Betahistine 24mg Tab
Betahistine 24mg Tab In Strip

29 May 2024
Haryana Supply Of Tool Kit Combination Of 210mixed Pieces
Tool Kit Combination Of 210mixed Pieces On Non-metallic/metallic Box With Inbuilt Mould For Each Item With Sub Mould For Each Piece. [ Warranty Period: 12 Months After The Date Of Delivery ]

03 Jun 2024
Maharashtra Lining Up Of Annual Rate Contrcat For Hiring Of 100 T Telescopic Mobile Crane In Cws At Rcf Thal.
06 Jun 2024
Madhya Pradesh Supply Of Bulk Head Male Connector
Male Connector 3/4" Od X 3/4" Bspt(m) As Per Icf Drg. No. Icf/std 3-5-016 Item-17 & As Per Icf/md/spec-166 Rev-4 Or Latest. Note-a) 01 No Sample To Be Approved Before Bulk Supply, As Per Drawing All 4 Items, Back F

28 May 2024
Gujarat Supply Of Hexagonal Head Screw
Hexagonal Head Screw For Axle Box Clamping Plate As Per Drg.no.wr-ccg-el/4-sc-002 Alt-3. [ Warranty Period: 30 Months After The Date Of Delivery ]

03 Jun 2024
Punjab Supply Of Hex Head Screw M8x25 Stainless Steel
Hex Head Screw M8x25 Stainless Steel, As Per Drawing: Is:1364(part-2)-1992, A2-70 To Is:1367(part-14)-1984,ce, Packing Instruction: Suitably Packed In Jute Bags [ Warranty Period: 30 Months After The Da

29 May 2024
Tamilnadu Supply Of S & I Of Frp Panel For Emu D Coach
Supply And Installation Of Frp Side Wall Panel/ End Wall Panel To Drg.no. Emu/d/mmts-4-2-001, Col-i, Alt-a,items-1 To 8,frp Partition Panel To Drg.no. Emu/d/mmts-4-3-001, Col-i, Alt-nil,item - 1,frp Roof

28 May 2024