Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Construction Of Major Bridge Across Vel River On Jategaon Budruk To Jategaon Khurd Road (odr-153)taluka Shirur, Dist.
Estimated Cost :40675585 INR
10 May 2024
Punjab Reconstruction Of Vr Bridge At Rd. 141750 Of Kala Singha Drain Under Jalandhar Smart City Mission.
Estimated Cost :2781798 INR
06 May 2024
Gujarat Construction Of Flyover At Kawas Patiya At Km14.400 And Vup At Reliance At Km11.220 On Nh53 Of Surat Hazira Section In Gujarat On Epc Mode
Estimated Cost :1221200000
03 Jun 2024
Haryana Rebuilding Of Arch Br. No. 63, 93, 103, 148 With Rcc Box Of Between Rpj-dui In The Section Of Aden/pta Under Sr.den-ii/umb.
Estimated Cost :9351595 INR
16 May 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Outsourcing Of Works/ Hiring Of Jcb Hire Charges Of Jcb With Fuel And Driver For Excavation And Other Job Works /hiring Of Jcb Per Hour Basis / Narnaul Town
Estimated Cost :18400 INR
26 Apr 2024
Jharkhand Supply Of Server With Os Windows Service 2022 Rok, Ups 5 Kva With 2hrs Backup, Layer 3 Core Switch With 10g Sfp Module, Layer 2 Distribution Switch With 10g Spf Module, Optical Fibre Sm 6 Core Armoured, Cat 6a Cable, Io Box Complete, Ofc Patch Cord Sc Sc,
17 May 2024
Punjab Providing Of Excavating In Post Holes Or Similar Holes Of 5 Cum Filling Ramming Earth Removing Surplus Soil, Mandl For Cement Concrete Type C 2136 Using 40 Mm Graded Stone Aggergate, Roof Truss Framed Trussed Purlins Crane Gantries Rails Fastenings Heavy
Estimated Cost :495357 INR
27 Apr 2024
Gujarat Design, Engineering, Manufacture, Supply, Installation, Testing And Commissioning Of Peeling Line.
Design, Engineering, Manufacture, Supply, Installation, Testing And Commissioning Of Fryer System.
Design, Engineering, Manufacture, Supply, Ins

15 May 2024
Delhi Construction Operation And Maintenance Of Z-morh Tunnel Including Approaches On Srinagar Sonamarg Section Connecting National Highway No 1 In The Ut Of Jandk On Dbfot Annuity Basis
24 May 2024
Kerala Construction Of Zoological Park At Puthur.
Construction Of Artificial Roack Stream And Tanks, Closing Of Existing Fence In Lion Exhibit And Steel Bridge In Gharial Exhibit.

Estimated Cost :3493273 INR
02 May 2024