Tenderskhoj
India
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
Uttar Pradesh Rectification Repair Work Of Pavement At Risk And Cost Of Concessionaire For The Project Of 4 Laning Of Gagalheri Saharanpur Yamunanagar Up Haryana Boarder Section Of Nh-73 From Km. 33.000 Design Ch. 35.400 To Km. 71.640 Design Ch. 86.855 In The State Of
17 Jun 2024
Uttarakhand Rectification/ Repair Work Of Pavement At Risk And Cost Of Concessionaire For The Project Of 4 Laning Of Chutmalpur- Ganeshpur Section Of Nh-72a From Chainage 0.000 To Chainage 17.900 And Roorkee-chutmalpur-gagalheri Section Of Nh-73
Rectification/

17 Jun 2024
Gujarat Short Term Maintenance Between Ch. Km 361/620 To 364/220 Kasbapar-navsari Road Ch. Km 368/520 To 370/620 Vejalpore-eru Road Of Nh64 In Navsari District In The State Of Gujarat Under Stmc M And R Scheme.
Estimated Cost :12654603
15 Jun 2024
Delhi Repairs /replacement And Replacement Of Sewage Line And Repair To Drains , Path, Hardstanding, Manhole/drain Covers, Rcc Jallies Fencing, Kabul Line Jcos/ Or And Did Lines With Office Area, Otm Accommodation And The Area Of Age B/r-ii Under Ge (east), Del
Estimated Cost :4991000 INR
04 Jun 2024
Haryana Supply Installation And Commissioning Of Cctv Cameras
Estimated Cost :8000000
05 Jun 2024
Kerala Resurfacing Of Internal Roads Of Kendriya Vidyalaya At Pangode Mil Station
Estimated Cost :976000 INR
29 May 2024
-Faridabad-Railway-Station(fdb):-Si"> Delhi -Faridabad-Railway-Station(fdb):-Si">Faridabad Railway Station(fdb): Site For Car Parking With Measuring An Area Of 635.70 Sq Mtrs. At Faridabad Railway Station (fdb) Towards West Station Building, Nsg-3 ( "a" Category Station), Other Than Delhi Area.
Faridabad Railway Station(fdb): Si

-Faridabad-Railway-Station(fdb):-Si">24 May 2024
Uttar Pradesh Parking Lot For Four Wheelers At Location Shahganj In (division Lucknow)
Parking Lot For Two Wheelers At Location Bhadohi In (division Lucknow) Having Approx. Area Of 164.48 Sq Mt
Parking Lot For Two Wheelers, Three Wheelers And Four Wheelers

30 May 2024
Uttar Pradesh Single Stage 2024-25 Handling And Transport Work At Block Navin Mandi District
21 May 2024
Odisha Widening And Strengthening Of Existing S/l, I/l, And D/l To 2 Lane With Ps To Nh-53 And Construction Of 3 Nos. Of Bypass From Km 266/800 To 267/300, 270/025 To 270/975, 284/700 To 285/780 On Nh-53 In The State Of Odisha .(refer Rfp For Details)
Estimated Cost :733100000
12 Jun 2024