Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Rajasthan Construction Of Gravel Road And Culvert In Khairasi Under Mahanrega Scheme.
Estimated Cost :2127000 INR
24 Jun 2024
West Bengal Construction C.c. Road And Culvert From B.n.r. G.t. Road To Dangalpara, Ward No 64, Borough-x Under A.m.c.2nd Call
Estimated Cost :585389 INR
10 Jul 2024
West Bengal Construction Of Culvert At Ward No. 20, Borough-v, Under Amc 2nd Call
Estimated Cost :651541 INR
09 Jul 2024
West Bengal Construction Of Culvert And Repairing Of Drain At Akwanbagan Gowalapra Of Ward No-73 Borough- Viii, Under A.m.c.2nd Call
Estimated Cost :172784 INR
09 Jul 2024
Uttar Pradesh Link Road Sthith Dalav Ghar Ke Samne Bhopa Road Culvert Se Transfarmer Tak Cc Sadak Nirman, Nali, Culvert Construction Work Avm Dalav Ghar Me Rcc Construction Work
Estimated Cost :2375322 INR
11 Jul 2024
Uttar Pradesh Construction Work Of Bridges, Drain, Interlocking Road.
Room Extension And Tiling And Toilets Work. #hindi Image

Estimated Cost :999000 INR
26 Jun 2024
Rajasthan Construction Of Grewal Road And Culvert In Kharkheda Khairasi Under Mahanrega Scheme.
Estimated Cost :2739000 INR
24 Jun 2024
Haryana Mandi Kehar Block: Badhra Panchayat: Mandi Kehar Dist, Annual Mtc. Work For Water Supply, Na Cement Plaster (in Fine Sand) 12 Mm Cement Plaster Of Mix : 3. 1:4 (1 Cement: 4 Fine Sand), Earth Work In Excavation By Mechanical Means (hydraulic Excavator) / M
25 Jun 2024
Himachal Pradesh 9. Strengthening And Widening Of Karchham Sangla Chhitkul Road Km. 0.00 To 18.00
Improvement Widening Of Road Metalling And Tarring Bm. Bc Construction Of V. Shape Drain Providing And Fixing Road Side Furniture And Edge Line Construction Of R/wall,

28 Jun 2024
Maharashtra Construction Of Bridge On Canal Near Dashkriya Vidhi Ghat At Kodit Bk To Kodit Kh Road Tal. Purandar Dist.
Estimated Cost :3653415 INR
27 Jun 2024