Tenderskhoj
India
- Industry Minerals and Metals
LOCATION SUMMARY DEADLINE
Sikkim Supply Of Cyl Clutch Master, Cyl Clutch Release, Repair Kit, Gasket, Joint Set Universal, Disc Clutch, Collar Clutch Release, Oil Seal Frt Wheel Hub, Oil Seal Timing Gear, Water Pump Assy, Belt V, Relay 4st, Repair Kit Scl, Part Kit Inner, Wheel Cylinder
15 Jul 2024
West Bengal Supply Of Clutch Master Cylinder, Wheel Cylinder Assy, Clutch Slave Cylinder, Vaccum Booster, Bush Kit, Caliper Assy Brake Fit - Tata Xenon Spare Parts
Qty : 8

16 Jul 2024
Uttar Pradesh Supply Of Brake Gear Pin No. 1
Brake Gear Pin No. 1,to Drg. No. L/pn-611/m, Alt. 5. [ Warranty Period: 30 Months After The Date Of Delivery ]

28 Jun 2024
Maharashtra Supply Of Primary Spring Outer For Lhb Nac Coache
Primary Spring Outer For Lhb Nac Coaches As Per Rcf Drawing Number Lg01100 Alt. Nil Conforming To Rdso Specification Number Rdso/2017/cg-01 Rev.02, Rsk Code No. F07 [ Warranty Period: 72 Months After

01 Jul 2024
Jammu & Kashmir Renovation Of Spring (dood Pokhar) Near Phe Pump Station At Zawoora By Way Of Rrm In Dry Raising Of Walls In 15 Mix, Construction Of Drain In M-15 Mix And Ms Grills Over Spring
Estimated Cost :2202000 INR
03 Jul 2024
Jammu & Kashmir Renovation/ Upgradation Of Syed Jaffer Spring Chatterhama
Estimated Cost :559000 INR
03 Jul 2024
Jammu & Kashmir Renovation Of Spring (lokut Pokhar) Near House Of Abdul Ahad Kumar At Zewan By Way Of Devri Stone Steps And Clearance Of Spring (including Cost Of Sign Board)
Estimated Cost :142000 INR
03 Jul 2024
Jammu & Kashmir Improvement/ Upgradation Of Spring At Dar Mohalla Ishber Nishat (including Cost Of Sign Board)
Estimated Cost :308000 INR
03 Jul 2024
Jammu & Kashmir Redevlopment/ Beautification Of Spring At Nallabal Amir Khan Nowshehra (including Cost Sign Board)
Estimated Cost :1732000 INR
03 Jul 2024
India Supply Of Galvanized Steel Sheets As Per Is 277 (q3)
Qty : 500

15 Jul 2024