Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bihar Supply Of Drinking Water Coolers With Built In Water Purifiction System (uv Or Ro) (q3)
qty:1

01 Oct 2024
Maharashtra Supply Of Overhauling Kit For Lru Control Portion 20-pipe (20- Cp), Kbi Pt. No. 787775-2004 Of Microprocessor Controlled Based Air Brake System Ccb-ii For Hhp Diesel Locomotives Consisting Of 51 Items As Per Annexure Attached. To Be Procured From Oem Or I
04 Oct 2024
Maharashtra Supply Of Pressure Transmitter For Railway Application, Input 10-30 Vdc, Output 4 To 20 Ma, Piezo Resistive Sensor 2 Wire System, Pressure Range 0 To 2.5 Kg/cm Q With Special Connector Specially Developed For Mounting On Bombardier Emu Rake Make : Jumo, W
07 Oct 2024
West Bengal Kmc/eebs/hq/vii/56/5/24-25/055
Development Of Bustee Drainage System At Different Places Of 7 Kamardanga Bustee, D. C Dey Road Bustee In Ward 56

Estimated Cost :502208 INR
24 Sep 2024
West Bengal Construction Of New Sea-farers Hostel Cum Club (g Plus 2) For Mercantile Marine Department #1. Furnishing The Building With Furniture For Restaurant Cum Bar, Lounge, Dormitories, Reception Area, Medical Room Etc & Installation Of Split Acs, Gyser, Water C
Estimated Cost :153000 INR
24 Sep 2024
Karnataka Tender For The Work Of Providing Laying And Extending Of 300mm Dia Existing Di Water Line From Manjunatha Circle And Linking To 200mm Dia Near Billekallu To Improve Water Supply To Muneshwara Layout And Bel 2nd Stage In Smv-2 S/stn Area Of Aeew2-2 Sub Div
27 Sep 2024
Uttar Pradesh Water Supply Maintenance, Sewer Maintenance And Sewer Strengthening Work In Various Sectors.
Maintenance Of Water Supply, Two Year Annual Maintenance And Repairing Of Vt Motor And Other Allied Electrical Works.
Maintenance Of Sewerage, Cleanin

Estimated Cost :2959000 INR
05 Aug 2024
Delhi Setting Up Physical Infrastructure For The National Institute Of Communication Finance (nicf) At Ghitorni, #1 Descaling Of Condenser Unit Of 140 Tr Capacity Chiller.
26 Sep 2024
Madhya Pradesh Supply Of Control Portion 20 Pipe (20cp) As Per Kbi Part No.787775-1994 For Ccb Brake System [ Warranty Period: 30 Months After The Date Of Delivery ] ]
28 Nov 2024
West Bengal Creation Of Drainage Channel At Mollah Para, Sansad No.-iv
Estimated Cost :145760 INR
28 Sep 2024