Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Tamilnadu 2023-2024 15th Fc 2nd Installment-560000
Construction Of Drain With Culvert At Ward No.4 And 8 Chinna Mariyamman Kovil To Majeet Street In Omalur Town Panchayat

25 Jun 2024
Kerala Repair And Maintenance Work Of Devadhar Rob In Malappuram District
Estimated Cost :1914434 INR
08 Jul 2024
Punjab Operation W/s Scheme Shanti Nagar, Bmc Colony, Dada, Chack Sadhu. Earth Work In Excavation P/f Pf Ci/pvc D Joint Of Diff Sizes P/f Pvc Socket Of Diff Sizes Bailing Out Water From Tranches And All Other Works Contingent Their Too.
Estimated Cost :24000 INR
18 Jun 2024
Haryana Providing And Fixing Cast Iron Detachable Joints Class-15 Marked With Is: 8794 For Use With Asbestos Cement Pressure Pipes Complete With 2 Nos. Rubber Rings Marked With Is:5382 And Is:10292 And Appropriate Number Of Nut And Bolts Marked With Is:1363 Inclu
Estimated Cost :49654 INR
18 Jun 2024
Karnataka Improvements To Roads, Drains And Culverts In Kalasti Nagara (block No.106.2) In Ward No.19, T. Dasarahalli,
Estimated Cost :1021000 INR
03 Jul 2024
Jharkhand Consultancy Services For Preparation Of Detailed Project Report (dpr) For Recontruction / Widening And Strengthening Of Road From Belwana More To Nima-jalgora-narotand Road Via Golgo-tilomaran-tisco Village Including Replacement Of Culverts And Bridges, P
23 Jun 2024
Karnataka Construction Of Bridge At Hudikeri Aiyangadu Changulanda Road In Hudikeri Gp Ponnampet Taluk Dr No 30/2023- 24
Estimated Cost :1011100 INR
21 Jun 2024
Haryana Sekhpur Sikarpur, Kishangarh, Bikaner, Gangacha Ahir, Gangacha Jat, Balawas Jama Pur, Group Of 6 No. Of 1 Outsourcing Of Works/ Dewatering Job Work Bailing Out Water From Tranches And Pits For Making New Connection In Fully Charged Pipe Line Up To 200
Estimated Cost :19418 INR
18 Jun 2024
Jharkhand Construction Of 3 Span Rcc Bridge In Front Of Jagarnath Das Field At Vill - Khurjiyo Harijan Tola G.p- Chegado Under Block- Dumari
22 Jun 2024
Uttar Pradesh Supply, Fixing, Installation And Decoration Of All Main Road, Chauraha, Green Belt, Pole Light, Bridge, Flyover/foot Over Bridge With Decorative And Innovative Lighting Complete In All Respect Under Mahakumbh Mela 2025. #hindi Image
02 Jul 2024