Tenderskhoj
India
- Industry Plastic & Rubber
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of 4720015068 Lv1 R72 Hose 40u 38 7 Bore Dia 38mm Wall Thick, 765 08 Sb358 Lv2 Icvs Hose, 4720 001238 765 05 Sb311 Lv2 Icvs Hose Assy Rubber, 4720720261316 Lv1 R90 Hose 2m25 15 Tu 38 005 1515 92 , 4720015065 Lv1 R72 Hose 40u12 13 Bordia12mm Walthk4
10 Oct 2024
Gujarat Road Work, Footpath Work, Drainage/ Strom Water Drain Work, Building & Other Works.
Providing & Fixing Of Paver Block.
Providing Of Tractor Trolley, Jcb & Other Machinery & Labour For Road Works.
Patch Work Of Road By Hot Mix Materials.

Estimated Cost :3000000 INR
26 Sep 2024
Maharashtra Supply Of Mil Mcfsp Board
Qty : 50

10 Oct 2024
Jammu & Kashmir Supply Of Ac Belt Of Mahindra Scorpio, M Oil Filter Of Mahindra Scorpio, Main Diesel Pipe Pump To Filter Of Mahindra Scorpio, Diesel Pipe Return Of Mahindra Scorpio, Accelator Padel With Sensor Of Mahindra Scorpio, Diesel Filter Cross Type Of Mahindra Sco
20 Sep 2024
Maharashtra Construction Of Bituminous Road To Aproach Road From Pump House To
Construction Of Bituminous Road To Aproach Road From Pump House To Ballarpur - Gondpipari State Highway And Construction Of Wbm Road From Pump House To Intake Gate Of Box Conduit Of

Estimated Cost :11724217 INR
26 Sep 2024
Uttarakhand Providing And Fixing Safety Net In Court Yard Area In Sr Hostel (b.no-85), Boys Hostel(b.no-77), Nursing Hostel(b.no-81)and Type-vi(b.no-67) At Aiims Rishikesh.
Estimated Cost :637923 INR
10 Oct 2024
Kerala Supply Of Display Board With Toughened Glass(5ftx3ft), Display Board With Toughene Glasss((3ftx2ft)
Qty : 30

10 Oct 2024
Bihar Supply Of Pp Bottle 200ml With Cap For Flavour Milk.
27 Sep 2024
Haryana Supply And Erection Of wall Mounting Type, Solenoid Driven, Motorized, Electromagnetic Diaphragm Dozing Metering Pump Working On Three-phase 220/240 V 50 Hz Electric Supply With Standard Electronic Controls, Suitable For Minimum Dozing Capacity 0 To 27 L
Estimated Cost :116880 INR
24 Sep 2024
West Bengal Supplying, Fitting And Fixing Various Components Of Fender Blocks And Repairing Of Damaged Concrete Structure At Hoj-i & Hoj-ii And Realignment Of Pontoon At Various Locations Within Dock Area For 2 Years.
04 Oct 2024