Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Karnataka Providing Grid Connected Solar Roof Top On Owned Buildings Of Mescom Jurisdiction And Operation And Maintenance
Design, Supply, Installation And Commissioning Of Solar Rtpv Grid Connected Power Plants On The Roof-tops Of Various Owned Buildings Of M

03 Oct 2024
Gujarat Supply Of Solar Power Plant (roof Top) For Ongrid System, Single Phase (q3)
Qty : 2

21 Sep 2024
Telangana Setting Up Of 3.5 , Mw Ac In House Captive Solar Pv Plant At Campus Which Including Planing Design Supply Installation Testing And Commissioning With 05 Years Post Commissioning Operation And Maintenance Of Plant.
14 Oct 2024
Uttar Pradesh Design, Engineering, Supply, Installation, Testing And Commissioning Of 100 Kwp (at Indian Bank, Civil Lines Prayagraj, 22 Pd Tandon Road, Civil Lines, Prayagraj) Grid Interactive Solar Photo Voltaic System At Indian Bank Own Premises.
27 Sep 2024
West Bengal Installation Of Solar Grid System At Roof Top Of Majhergram Gram Panchayat 10 Kw Solar Pv Roof Top On Gride Solar Power Genarating System At Majhergram Gp Ranaghat Ii Dev Block Saap No 01 2024 2025
Estimated Cost :735237 INR
24 Sep 2024
Delhi Selection Of Solar Power Developers For Setting Up Of 1200 Mw Ists-connected Solar Pv Power Projects H Energy Storage Systems (ess) With 600 Mw/2400 Mwh Anywhere In India Under Tariff-based Competitive Bidding, On Build-own-operate (boo) Basis.
Estimated Cost :50000000000 INR
22 Oct 2024
Maharashtra Hiring Of Project Management Consultant For 1352 Mw Solar Power Projects 102 Nos Under Mskvy 2.0 Pm Kusum Component C In The State Of Maharashtra
11 Oct 2024
Uttar Pradesh Selection And Discovery Of L1 Rates For Rate Contract For Epc Of Grid Connected Rooftop Solar Pv Projects (51-200 Kw) Across India
10 Oct 2024
Assam Supply of 05kw solar pv panels 545 wp gautam solar sova solar, power conditioning unit single phase 05 kw 96v hi brid mppt based inverter enertech ups, battery bank 1v d80c 12v 150 ah c10 solar battery exide, complete bos materials including tin shade structure ac dc cable earthing chemical for inst
23 Sep 2024
Madhya Pradesh Supply of off - grid solar photovoltaic (pv) power plant (q3)
Qty:14

25 Sep 2024