Tenderskhoj
India
- Industry Cement
LOCATION SUMMARY DEADLINE
Haryana Construction Of Bus Que Shelter At Village Mullana In District (c.m. Announcement No. 19790 Dt. 31.07.2017)
Estimated Cost :12119881 INR
26 Jun 2024
Uttar Pradesh Zone-1 Chhatta Room Number-32 Construction Work Of Drain And Road By Interlocking Tiles From Shyam Babu Green Clean Hostel To Than Singhs House In Brijkunj In Azad Nagar.
Estimated Cost :845649 INR
14 Jun 2024
Arunachal Pradesh Supply Of Tata Sky, White Paint, Candles For Ro 50 Ltr, Membrane For Ro 50 Ltr, Fly Catcher, One Plus 32 Led Tv - Tata Sky Qty : 18
29 Jun 2024
West Bengal Supply Of Paint Rfu Olive Green, Rod Welding Steel Mild, Plywood For General Purposes, Fevicol Sr 998, Fuel Feed Pump, Armature Assy, Rod Welding Copper, Avr Assy - Ord Head Qty : 30
29 Jun 2024
Haryana Cleaning Of Sewer Lines And Relaying Of Sewer Line And Construction Of Manhole In Sector 4 Urban Estate Kurukshetra.
Relaying Of Sewer Line Construction Of Manhole 80mm Interlocking Paver Block Cleaning Of Sewer Line Complete In All Respect And All

Estimated Cost :8128639 INR
18 Jun 2024
Madhya Pradesh Repair Of Paint Ball Gun, Repair Of Speaker, Repair Of Combat Helmet Qty : 313
29 Jun 2024
Uttar Pradesh Supply Of Refractory Nozzle 25 Mm High Alumina Material As Per Is: 89532006 Or Drg No Ofm-90201a Required Ap Is, High Alumina Fire Bricks Size 229 X 114 X 76 Mm To Drg No Ofm- 01864a Sl No 2 To Specn Ofm-62-01, Refractory Sprue To Drg No Ofm-40199 To Spec
29 Jun 2024
Haryana Construction Of Ipb Phirni At Village Chilawali Block Tauru Distt
Estimated Cost :3710544 INR
18 Jun 2024
Haryana Construction Of Ipb Phirni At Village Malhaka Block Tauru Distt
Estimated Cost :2098135 INR
18 Jun 2024
Haryana Construction Of Ipb Phirni From At Village Chharora, Block Tauru, Distt.
Estimated Cost :604642 INR
18 Jun 2024