Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Haryana Drilling Of Tubewell And Pumping Machinery, Repair Of Pump Chamber, Construction Of Boundary Wall, Laying Of Rising Main And Construction Of Cc Path. Drilling Of Tubewell And Pumping Machinery, Repair Of Pump Chamber, Construction Of Boundary Wall,
Estimated Cost :388902 INR
03 Jun 2024
Jammu & Kashmir Construction Of Road From Kholian Wali Gali To Topa Peer, Block Buffliaz, Tehsil Surankote, Distt. Poonch By Way Of Earth Work In Cutting, Cross Drainage, Walling, Providing And Laying Of 150 Mm Thick Wbm Grade-ii, 75mm Thick Wbm Grade-iii, 50 Mm Thick Bm
Estimated Cost :59000000 INR
19 Jun 2024
Rajasthan Repair /maintenance Of Certain Drains, Boundary Wall, Fencing, Jefferies Wall, Path Hard Standing, Garbage Bin Etc And Certain Shed, Garbage Shutter, Rolling Shutter, Iron Gate Etc In Domestic Area At Af Stn Utarlai
Estimated Cost :4980000 INR
17 Jun 2024
Goa Hot Mixing Of Roads Along With Drains At Sao Pedro In Ward No I Of V.p Old Goa In Taluka.
03 Jun 2024
Andhra Pradesh Construction Of Cc Road, Laying Of Metal Spreading, Cable Duct, Kerb Wall, Switch Yard Foundations Plinth Raising, White Washing To The Entrance Of Compound Wall Etc., At 132 Kvss, Rayachoti.
Estimated Cost :2756253 INR
11 Jun 2024
Jammu & Kashmir Widening Of Road From Bhandarkoot To Drandooru-dam Site Of Pakal Dul He Project (rd 0/0 To Rd 0/300), Cvppl, Jnk.
Estimated Cost :2759777 INR
17 Jun 2024
Assam Repair And Maintenance Of Ppgi Erected Over Footpath Band Stand Shed Near Offrs Mess And Garden Lights Of Offrs Mess At Lekhapani Garrison Of Hq 25 Sector Ar
Estimated Cost :477035 INR
10 Jun 2024
Karnataka For 28 Work Comprising Of Approved Building And Road Works Under Kkrdb 2023-24.
03 Jun 2024
Kerala General - Pre Monsoon Work 2024-25 - Under Wadakkancherry Section In Thrissur Section-kodungallur-shornur Road 50/805 To 53/605 & 58/200 To 62/605 , Chavakkad Wadakkanchery Road 19/015 To 28/515 , Kuranchery Velur Road 0/000 To 7/000 , Chittanda Thalasser
04 Jun 2024
West Bengal Construction Of Concrete Road S S Bose Sarani At Ward No 17.
Estimated Cost :1861804
10 Jun 2024