Tenderskhoj
India
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Maharashtra Providing And Erecting 1.80 Mtr. High Fixed Knot Fencing With Main And Wicket Gate To Campa Kuran Vikas Plantation (10 Ha.) At Dolhari In Comp.no.127 In Khopadi Beat In Darwha Round In Darwha Range In Forest Dn. (l 1500 Rmt.)
10 Jun 2024
Maharashtra Providing And Erecting 1.80 Mtr. High Fixed Knot Fencing With Main And Wicket Gate To Campa Plantation (10 Ha.) In Comp.no.209 In Ramgaon Beat In Wadgaon Range In Forest Dn. (length 1219 Rmt.)
10 Jun 2024
Uttar Pradesh Guarding Of Damage Poles, Loose Electric Wire, Increasing Height To Electric Line, Fencing Barricading Of Transformer And Replacement Of New Poles Under Edsd Gursarain.
Estimated Cost :250000 INR
18 Jun 2024
Karnataka Design, Built, Operate And Tranferof Faecal Sludge Treatment Plant (fstp) Underused Water Management Projectin 11 Ulbs(package -7)
Construction Of Faecal Sludge Treatment Plants (fstp) In 11 Ulbs ( In Varying Fstp Capacities Of 3 Kld / 6 Kld / 9 Kld

Estimated Cost :260477778 INR
15 Jun 2024
Karnataka Design, Built, Operate And Tranfer Of Faecal Sludge Treatment Plant (fstp) Under Used Water Management Project In 9 Ulbs (package -4)
Construction Of Faecal Sludge Treatment Plants (fstp) In 9 Ulbs ( In Varying Fstp Capacities Of 3 Kld / 6 Kld / 9 K

Estimated Cost :201096637 INR
15 Jun 2024
Rajasthan Annual Rate Contact For Fabrication Work Under Distt. Dn. South.
Estimated Cost :700000 INR
05 Jun 2024
Karnataka Design, Built, Operate And Tranfer Of Faecal Sludge Treatment Plant (fstp) Under Used Water Management Project In 8 Ulbs (package -3)
Construction Of Faecal Sludge Treatment Plants (fstp) In 8 Ulbs ( In Varying Fstp Capacities Of 3 Kld / 6 Kld / 9 K

Estimated Cost :188095630 INR
15 Jun 2024
Maharashtra Supply Of Cassette Air Conditioner, 18 Hp Side Discharge Vrf Odu, Metal St Fixture For Odu, Drain Pipe, Copper Piping, Power Supply Cable, Installation, Pvc Casing - Cassette Air Conditioning Installation. Qty : 50
24 Jun 2024
Andhra Pradesh Capital Repair Works Of Billet Transfer Grid, Furnace, Mill Proper, Diverter, Cooling Bed Of Structural Mill.
10 Jun 2024
Andhra Pradesh Annual Overhauling Of Esp And Bottom Ash Handling System In Tpp Boilers.
24 Jun 2024