Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Telangana Providing Security Guards Employees On Outsourcing Basis To Forest Officer For The Year 2024-25
Estimated Cost :3494989 INR
15 Jul 2024
Punjab Supply Of Set Of Carline For Lhb Chair Car Coach
Set Of Carline For Lhb Chair Car Coach, As Per Drawing: Mp15jcalscz Version 2, Packing Instruction: Carline Assly The Supplier Shall Pack The Three C/set (segments) Of Carlines In A Suitably Designed

26 Jun 2024
Jharkhand Supply Of Safety Goggles, Dot Punch 100 Mm, Combination Set 300 Mm, Micrometer Outside 0 - 25 Mm, Micrometer Outside 25 - 50 Mm, Micrometer Outside 50 - 75 Mm, Micrometer Inside, Vernier Caliper 150 Mm, Vernier Height Gauges, Vernier Bevel Protractor Blad
03 Jul 2024
Jammu & Kashmir Supply Of Ups, Desktop Computer With Monitor
Qty : 28

15 Jul 2024
Uttar Pradesh Supply Of Set Of Stainless Steel Corner Panels For Lhb Gs(eog) Coaches.
Set Of Stainless Steel Corner Panels For Lhb Gs(eog) Coaches As Per Planning Set List No: Mplsscplwgs Version 2, Packing Instruction - Pi014 . [ Warranty Period: 30 Months After

03 Jul 2024
Punjab Supply Of Fully Assembled Improved Bogies
Set Of 2 Instrumented Wheel Sets (4 Imws Mounted In Pairs On Each Of 2 Axles) Alongwith Theaccessories And Services Shall Be Supplied For Running Trials Of The Prototypes For Lhb Coaches As Per Rdsotechnical

27 Jun 2024
Rajasthan Testing Of Ehv Grade Transformer Oil Samples Of Generator Transformer Installed At Mahi Ph1 Banswara And Mahi Ph2 Bagidora.
Estimated Cost :41772 INR
08 Jul 2024
Tamilnadu Supply Of Partition Frames
One Coach Set Of Stainless Steel Partition Frames, Chair Pillars And Water Tank Ceiling Construction And Body Shell Items For Lgs Eog Coaches With Modular Toilet To Drg. Nos. 1. 58110085, Col.i, Alt 'b' - 1 No 2. 58110049,

01 Jul 2024
Tamilnadu Supply Of Ls Roof Assembly
One Coach Set Of Ls Roof Assembly To Drawing No. 58116032, Col I, Alt 'k' - 1 No. (58110037, Col.i Welding Pin To Be Assembled) Along With Roof End Part To Drg No 58116066, Col I, Alt 'g' - 2 No. The Firm Shall Fulfill The

01 Jul 2024
Punjab Supply Of Terminal Pad
Terminal Pad Complete To Drg.no. Wlrrm8-7-2-820/col-i, Alt-f And Specification No.icf/elec/862, Rev-01. [ Warranty Period: 30 Months After The Date Of Delivery ]

28 Jun 2024