Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Haryana Supply Of Axle Box Identification Tag
Axle Box Identification Tag For Icf Wheels As Per Drg. No.- Judw/mech/12-629 [ Warranty Period: 30 Months After The Date Of Delivery ]

03 Jun 2024
Gujarat Supply Of Guard Seat For Goods Brake Van
Guard Seat For Goods Brake Van For Bvzi Wagon As Per Rdso Drg. No. Wd-04059-s-01, Alt.1. [ Warranty Period: 30 Months After The Date Of Delivery ]

31 May 2024
Bihar Supply Of Potentio Meter As Per M/s Ftrtipl Part No :- 034106000a For Driver Brake Controller Maintenance Of Ftrtipl Make Brake System 3 Phase Locomotive
Potentio Meter As Per M/s Ftrtipl Part No :- 034106000a For Driver Brake Controller Maintenance

28 May 2024
Maharashtra Supply Of Horn 20 Deg Assy Lh-1800 Of Schunk Panto
Horn 20 Deg Assy Lh-1800 Of Schunk Pantograph Type Wbl 23.03 Part No. 909010021700 Drg. No. Ref. No. - G87 Ph 85 Hs 06-00 Procured From Schunk Carbon Technology India Pvt. Ltd. Or Its Authorized Sou

28 May 2024
Tamilnadu Supply Of Supply And Installation Of Seat Fixing Profile For Train Set Tc Coaches
Supply And Installation Of Seat Fixing Profile For Train Set Tc Coaches Todrg. Ts/dtc-6-1-003,col-ii,alt-a. Please Visit Icf Vendor Portal For Downloading Drawing Http

29 May 2024
Maharashtra Lining Up Contract For Inspection, Repair & High Speed Dynamic Balancing Of Rotor Of Ip Compressor Bcl407/a Of Synthesis Gas Compressor Unit In Ammonia Plant At Rcf Thal Unit.
03 Jun 2024
Gujarat Supply Of Lateral Damper 200 Kg
Lateral Damper 200 Kg As Per Icf Drawing No Dc/emu/m/asr-0-5-005 Alt N/6 Item No 2 & Conforming To Rdso Specification No. C-8703 Rev 2 With ,amendment -1 Of August -2016. Specn: Dc/emu/m-asr/0 [ Warranty Period: 30 Mo

31 May 2024
Gujarat Lining Up An Agency For Work Of Providing Agent Associated Services For Handling Of Time Chartered Vessels At Wrpl Vadinar. Qty : 1
Estimated Cost :9887728 INR
13 Jun 2024
Haryana Supply Of Ms Hex Adopter Male
Ms Hex Adopter Male Thread Size 3/8" Bsp & Size 3/4" Bsp [ Warranty Period: 30 Months After The Date Of Delivery ]

03 Jun 2024
Tamilnadu Supply Of S & I Of Frp Panel For Emu D Coach
Supply And Installation Of Frp Side Wall Panel/ End Wall Panel To Drg.no. Emu/d/mmts-4-2-001, Col-i, Alt-a,items-1 To 8,frp Partition Panel To Drg.no. Emu/d/mmts-4-3-001, Col-i, Alt-nil,item - 1,frp Roof

28 May 2024