Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of 12256 - Capd Solution 2.5% With Minicap ( Na-538, Na.l.448, Cacl3-25.7 Mgcl- 5.08) 2.5 Or 2 Ltr.
12256 - Capd Solution 2.5% With Minicap ( Na-538, Na.l.448, Cacl3-25.7 Mgcl-5.08) 2.5 Or 2 Ltr.

27 Jun 2024
Maharashtra Supply Of 10568 - Capd 1.5% With Minicap (na-538, Na.l-448,cacl3-25.7 Mgcl-5.08) 2.5 Ltr. Or 2 Ltr.
10568 - Capd 1.5% With Minicap (na-538, Na.l-448,cacl3-25.7 Mgcl-5.08) 2.5 Ltr. Or 2 Ltr.

27 Jun 2024
India Supply Of Sagger (muffle) Size 200 X 300 X 100 Deep Shape Square Type
Qty : 100

05 Jul 2024
Haryana Annual Maintenance Water Supply Sainthly And Bhikhewala.
Comprehensive Maintenance Of Gaseous Type Full Vacuum Chlorination System And Refilling Of Chlorine Gas Cylinders At Sainthly Ww And Bhikhewala B/s And All Other Works Contingent Thereto For A

Estimated Cost :999600 INR
26 Jun 2024
Tamilnadu Ttps – Mech.ii – Bm – Unit Iv - Cleaning And Painting Of Safety Valve Silencers, Vent Pipes, Coutant Bottom Enclosure Structures In Boiler During Overhaul For The Year 2024 – 2025
02 Jul 2024
Odisha Expert Engineer Supervision In Over Hauling Of Centrifuge
Qty : 1

05 Jul 2024
Uttar Pradesh Work Of Making Drain And Cc Road Till The Street.
Estimated Cost :2540866 INR
24 Jun 2024
Karnataka Construction Of R C C Drains Cross In Kalalanagar In Ward No.15 (scp/tsp Works Block No.79/2)
Estimated Cost :1021886 INR
03 Jul 2024
Tamilnadu Ttps – Mech.ii - Bm – Unit Iv - Strengthening Of Structural Supports, Rectification Of Defects In The Hangers Rods At 56 Mtr Elevation Boiler Roof During Overhaul For The Year 2024 – 2025
02 Jul 2024
Haryana Construction Of Boosting Station, Distribution, Fhtc, 1 No. S/s Tank, 1 No. Hlt , 1no. Cwt, 2 No. Fb
Estimated Cost :16770452 INR
05 Jul 2024