Tenderskhoj
India
- Industry Fire Safety and Security
LOCATION SUMMARY DEADLINE
West Bengal Supply Of Fuel Guage Army Bus, Km Head Tata Ambulance, Speed Sensor Tata Ambulance, 4st Relay Tata 2 5 Ton 12 V, Solenoid Switch Tata 2 5 Ton 12 V, Field Coil Assy Tata 2 5 Ton 12 V Round, Bush Set Tata 2 5 Ton For 12 V Self Starter
qty:18

11 Oct 2024
Tamilnadu Supply Of Seal Oil For Trip Lever Shaft.
Seal Oil For Trip Lever Shaft To Dlw Drg Tpe-10-0002 Alt-f Or Latest And To Dlw Part No.10170765. [ Warranty Period: 24 Months After The Date Of Delivery ] ]

26 Sep 2024
Uttar Pradesh Supply Of Linear Heat Detector (c&w Item)
Supply Of Linear Heat Detector (lhd) Cable (ul Or En Approved, 105-110 Deg C, Approx. 30 Meters) Compatible For Automatic Fire Smoke Detection And Suppression System Fitted In Lhb Pantry, As Per Rdso Specifi

03 Oct 2024
Jammu & Kashmir Supply Of Oil Filter, Air Filter, Wiper Motor 24v, Fan Belt Pto Water Pump, Gasket Thermostat, Stud, Spring Washer, Bolt Cyl Head, Bolt 10x18 5, Gasket Oil Seal Housing, Cover Boot, Combination Switch, Water Pump Pully
qty:23

Estimated Cost :50000
11 Oct 2024
Delhi Annual Maintenance Of Integrated Security Surveillance System - Theft Prevention, Employee Safety, Facility/asset Protection, Public Safety, Event Video Surveillance; Comprehensive; Hardware, Software, Networking System, License, Wireless System; Consumab
Estimated Cost :950000 INR
11 Oct 2024
Madhya Pradesh Supply Of Propeller, Obs Spare Filter Assemble Oil, Fuel Filter, Air Filter, Fuel Line, Plug Dcpr6e, Repair Kit W Oblique P, Impeller, Seal Kit, Washer
qty:66

11 Oct 2024
Madhya Pradesh Supply Of Nitrogen Module To Sanrok
Nitrogen Module To Sanrok Part No. 2ed-245-4989 For Automatic Fire Detection Cum Suppression System. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

24 Sep 2024
Madhya Pradesh Supply Of Charging Unit
Charging Unit To Sanrok Part No. 2ed-254-3523 For Automatic Smoke/fire Detection With Alarm System. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

24 Sep 2024
Gujarat Supply Of Rtd Sensor, Heater 16-400w (waterproof).
24 Sep 2024
Rajasthan Construction Of Various Building For Permanent Campus Of Iit Phase 3a At Karwar Nh 65 Rajasthan Including All Civil And Electrical Works In Building Internal And External Services Development Works Including Ht Cable Lt Ccable Lifts Hvac Fire Fighting And
Estimated Cost :685370 INR
27 Sep 2024