Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Andhra Pradesh Contract For Design, Supply, Installation, Testing And Commissioning Of Grid Tied Roof-top Solar Pv Plant Including 5 Yrs. Amc With Generation Guarantee Under Kg Basin
30 May 2024
Andhra Pradesh Supply Of Breather Assemble Model Dto-8 Or Equivalent For Reactor (q3), Breather Assemble Model Dto-9 Or Equivalent For Reactor (q3), Breather Assemble Model Dto-9 Or Equivalent For 400kv Reactor (q3), Breather Assemble With 3 Containers For Ict (q3) Qty
16 May 2024
West Bengal Annual Maintenance Contract/ Comprehssive Annual Maintenance Contract Of Solar Energy Power Plants - Non- Comprehensive; Others; On-grid Solar System Qty : 1
Estimated Cost :2695587 INR
07 Jun 2024
Andhra Pradesh Bos Package Of Ists-connected Wind Energy Project(s) Of Nominal Capacity Of 1200 Mw With Green Shoe Option Up To 300 Mw At In Andhra Pradesh
05 Jun 2024
Maharashtra Consultancy To Verify Land For 2.5 Gw Solar Projects - Empanel Agencies To Verify Land Titles And Measure Land Parcels Spanning 10, 000 Acres To Develop 2, 500 Mw Solar Power Projects.
28 May 2024
Andhra Pradesh Solar Roof Top 20kwp Ongrid Plant Arrangement In Connection With Provision Of 28 Nos. Lifts At Various Stations Over Division Under Amrit Bharat Scheme
Estimated Cost :12639444 INR
05 Jun 2024
Maharashtra Reputed Solar Panel Electricity Provider For Fitting A 38 Kv Solar Power Plant In The Premises Of Bramha Aangan Co-operative Housing Society Ltd Salunkhe Vihar Road, Kondhwa.
21 May 2024
Haryana Town- Estimate For Installation Of Solar Power Plants On Ground Mounted In Existing 5 Mld S 1 Pipes / Pvc Pipe 6kgf P/f Pvc Pipe 150mm Supreme Complete In All Respect /150mm / Assandh Town
Estimated Cost :40500 INR
09 May 2024
Haryana Town- Estimate For Installation Of Solar Power Plants On Ground Mounted In Existing 5 Mld S 1 Pipes / Pvc Pipe 6kgf P/f Pvc Pipe 150mm Supreme Complete In All Respect /150mm / Assandh Town
Estimated Cost :41000 INR
09 May 2024
West Bengal Installation Of 25 Kwp Off Grid Solar Power Plant At Bops Along Indo Pakistan Border And Indo-bangladesh Border For 732 Nos Bops.
Supply Installation Commissioning Commissioning Of 01 No 25 Kwp Off Grid Solar Power Plant At Bop Charland Of 6 Bn Bsf S

Estimated Cost :3401000 INR
15 May 2024