Tenderskhoj
India
- Industry Textiles
LOCATION SUMMARY DEADLINE
West Bengal Supply Of Leather Hand
Leather Hand Gloves For Welding Purpose Made Of Heat Resistance Leayher With Inside Lining Fire Resistance Cloth As Specification/ Terms & Condition Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]

19 Jun 2024
Uttar Pradesh Supply Of Permanent Magnetic Yoke (rope Type) To Carryout Magnetic Particle Testing
Permanent Magnetic Yoke (rope Type) To Carryout Magnetic Particle Testing (wet And Dry Method) As Per Is:3703/2004. The Technical Specification Is Given Below; 1) Li

19 Jun 2024
Rajasthan Supply Of Bag, Lace Pad, Momento, Diary, White Paper, Carbon, File Cover, Glue, Tag, Allpin, File Cover, Registers, Stamp Pad, Pl Form, Cash Book, Log Book, Fbc Bill Form Etc.
Estimated Cost :1500000 INR
21 Jun 2024
Jammu & Kashmir Supply Of Distil Water With Electro Lite For Bty, Led Bulb 12 Volt, Water Matka, Water Filter Candle, Green Cloth, Sand Bag, 30x30 Tarpulin, 15x15 Tarpulin, Adaptor For Ptz Camera 5v 3a, Adaptor For Ptz Camera 12v 3a, Baofange Walkie Talkie Bty, Clock Wal
Estimated Cost :100000 INR
03 Jul 2024
Madhya Pradesh Supply Of Set Of Painting Roller & Holder.
Set Of Painting Roller & Holder : Each Set Consist Of 5 Rollers-material Cotton, Length 6 Inch , Diameter 1 Inch & 1 Roller Holder. Set Of Rollers Should Be Suitable For Pu Painting And Alkyd Painting. Two

21 Jun 2024
Gujarat Supply Of Office Bags Laptop Bags (q3)
Qty : 182

28 Jun 2024
Jharkhand Providing And Commissioning Of Pvc Sheathed Multi Core Copper Cable 16 Sq. Mm X 4 Core, 10 Sq. Mm X 4 Core, Ss Ceiling Rope 12 Mm And Ss Clamp For Belt Conveyor No. 929 (shuttle) And 930 (trolley) For Rlb Top Of Coal Receiving Bunker For Rlb Section
Estimated Cost :255527 INR
24 Jun 2024
Andaman and Nicobar Islands (UT) Supply Of T Shirts, Ships Caps, Ship Stone Mementoes, Key Chain, Wall Clock With Ship Logo - Procurement Of Amenity Items Qty : 330
Estimated Cost :150000 INR
03 Jul 2024
Uttar Pradesh Supply Of Judo Dress Or Judo Gi (q4)
Qty : 6

22 Jun 2024
India Supply Of Footwear - Package C
Qty : 664

Estimated Cost :1900000 INR
03 Jul 2024