Tenderskhoj
India
- Oil & Gas Petroleum and Fuel Products
LOCATION SUMMARY DEADLINE
Haryana Badhram-estimate For Providing Of Water Supply Scheme By Laying Of Distribution Pipeline With Installation Addtional T/well In Dhani Village Badhram(naingala Dhani)block Prithla(district Palwal) Under Jjm
Estimated Cost :2110232 INR
18 Jun 2024
West Bengal Auction Sale Of Depot Ferrous Scrap (null) - Lot No.y.hf-1.exmp.g-2 & F-1.06.24.38 Description- Scrap Steel Fabrication (heavy) And Misc. Large Bulky Assembles.tank Case Holder And Similar Receptacles .misc Items Of Steel, Such As Furniture, Buckets Iron
17 Jun 2024
Kerala Borewell Motor Maintenance Pro.no-6/23 2) Pipeline Maintenance Of Drinking Water Schemes Pro.no-7/23 And 3) Annual Maintenance Of Street Lights Pro.no-4/25
05 Jul 2024
Haryana Construction Of Office Building For Medical Education And Research Department (dmer) Plot No. Ip-1 (p) In Mdc, Sec.-6 .
Providing Of Hvac System Only.

Estimated Cost :27354683 INR
26 Jun 2024
Gujarat Providing Of Khera Material & Sewing, Hatchery Cloth & Sewing, 4.5 X 2.5 X 1 Meter Conditioning Hapa, 2x1x1 Meter Conditioning Hapa For Making & Repairing Of Khera At Farm.
Electric Repairing Work- Wiring Work, Focus Fitting Work, Switch Board Repai

18 Jun 2024
Uttar Pradesh Pipe Line Fixing Work
Estimated Cost :3998000 INR
02 Jul 2024
Kerala Auction Sale Of Unserviceable Fuel Injection Assy. Leyland/tata Scrap Aluminum Radiator And Inter Cooler Various Types Of Unserviceable Clutch And Clutch Parts Cast Iron Scrap Iron Sheet Metal Items Scrap Bearings Old Aluminum Cut Pieces Old Gi Cut Pieces
24 Jun 2024
Uttar Pradesh Pipeline Expansion Work From Bhita Of Nava Talab To Primary School Ram Singh In Ward No 3 Krishna Nagar.
Estimated Cost :1716000 INR
03 Jul 2024
Kerala Operation Maintenance Water Supply Schemes Maintenance Of Arwss To Thalayazham And Adjoining Villages Maravanthuruth Panchayath Maintenance Of Various Distribution System For One Year Pipeline Work
Estimated Cost :558824 INR
22 Jun 2024
Maharashtra Work Contract For Various Restoration Works Of Esp Internals Along With Replacement Of Esp Inlet Gas Distribution Screen (gd Screen) During Unit Overhaul At Ash Handling Plant.
Supply Of Chemical Suit At 3x660mw Ktps.
Work Contract For Repairi

Estimated Cost :8146820 INR
30 Jun 2024