Tenderskhoj
India
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
Himachal Pradesh Construction Of Link Road To Nyoll Chamen Km 0/d To 2/250.
Providing And Laying Of Gsb, G-ii, G-ill And Premix Carpet With Seal Coat In Km. 0/500 To 1/0) Under Otmnp.

Estimated Cost :1199998 INR
29 Jun 2024
Rajasthan Work Of Providing Road Light Mechanic Along With Manual Labour For Repairing Road Lights From Ward No. 01 To 35.
Estimated Cost :980000 INR
26 Jun 2024
Haryana Construction Of Rasta House Of Mubarik S/o Islam To Ajeem S/o Aas Mohd Village Baghola Block Ferozpur Jhirka Division
Estimated Cost :412551 INR
27 Jun 2024
Maharashtra Construction Of C.c. Road Behind Vikas Nagar Area At Gaytri Nagar Various Places (from H/o Mathpati To H/o Prabhu Appa Alamkahane To H/o Ajay Yadav) In Prabhag No. 19 Nwcmc
Estimated Cost :2559370 INR
26 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Miscellaneous Items/ Nut And Bolt Nut And Bolt / Haffed Booster No. 2 At Narnaul Town.
2 Motor Spare Parts & Repairs/ Carriage Of Burnt Motor To Workshop & Back Carriage Of Burnt Motor Monoblock Of All Sizes

Estimated Cost :19824 INR
21 Jun 2024
Haryana Construction Of Phirni Bus Stand Se Sarkari School Se Subash Pandit Ke Ghat Tak At Village Jhabwa Block Bawal Distt
Estimated Cost :6809962 INR
27 Jun 2024
West Bengal Construction Of Concrete Road From Fardir Shib Mandir To Arun Guha House .. Sansad No.vii Under Madarat G P Activity Code 67019006
27 Jun 2024
Maharashtra Providing And Laying D.i. Pipe Line Network (from H/o Shiva Mangnale To H/o Kendre) In Sai Nagari, Vedant Nagar In Taroda Khu And Construction Of Cc Road From H/o Shankar Mangnale To H/o Maroti Kendre In Sainagari Prabhag No. 01 Nwcmc
Estimated Cost :4704369 INR
26 Jun 2024
Haryana Town Annual Mtc. Works For Water Supply 1 Motor Spare Parts & Repairs/ Carriage Of Burnt Motor To Workshop & Back Carriage Of Burnt Motor Monoblock Of All Sizes To Workshop & Back Including Loading And Unloading. /all Size Motor / District Library Booster
Estimated Cost :18500 INR
21 Jun 2024
Himachal Pradesh Construction Of Link Road Karora To Nauni Km 0/00 To 1/500.
F/c In Km 0/b10 To 0/900) (dmft).

06 Jul 2024