Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Jammu & Kashmir Supply Of Composite Multi Layer Pipe With Aluminium Core Interior Tube Bound Dia 25mm, Gi Tank Nipple 25mm 6 Inch With Check Nut Washer Complete, Ppr Elbow 32mm, Ppr Socket 32mm, Ppr Equal Union Inner Dia 25mm Outer Dia 32mm Complete, Ppr End Cap 32mm Dia
05 Jun 2024
West Bengal Supply And Delivery Of Foundation Bolt (incl. Nut, Washer, Pipe Sleeve And Square Plate) For The Job Of Civil, Building And Ug Piping Project, Haldia Petrochemicals Limited, Haldia,
Estimated Cost :500000 INR
10 Jun 2024
Madhya Pradesh Supply Of Distributor Valve .
Distributor Valve As Per Kbi Part No.-wbstv200aa009 For Vande Bharat Train [ Warranty Period: 30 Months After The Date Of Delivery ]

12 Jun 2024
Maharashtra Supply Of Heavy Duty Revolving Centre, Mt - (5 Bearings)
Heavy Duty Revolving Centre, Mt - (5 Bearings) Style N Rated Load At 100 Rpm 5000 Kg, Radial 12500 Kg. Angle 1.2 174, R 10, Id 63 Mm, Od - 180 Mm, Make Tool Tech, Turnmax & Kakamari Tools & Eq

10 Jun 2024
West Bengal Extension Of 6.6kv 70sq.mm Grade Cable, 3.3kv 70 Sq.mm Grade Cable With 550v Acb And Drill Panel And 3 In Dia. Spray Pipeline With Manifold For Development Of Panel-8 In R-viia By Lhcm-1 At 3n4 Incline, J.p.colly
Estimated Cost :872535 INR
14 Jun 2024
Assam Supply Of Emergency Brake Accelerator Eb3 S/l With Bracket For Lhb Excise Duty -- Coaches. Part No:- M/s Knorr Bremse Part No. I 89368 As Per Drg.no. Part No:- M/s Knorr Bremse Part No. I 89368 Specn: Part No:- M/s Knorr Bremse Part No. I 89368
Emer

12 Jun 2024
Assam Supply Of '' Must Change Kit For 6th Year Maintenance Schedule Of Faiveley Make Disc Brake System Of Lhb Power Car Coaches As Specified In Annexure -b3 (kit-2).'' Note:- At A Time 60%pbec-254-160 And 40% Pbac 254-130 Of Total Quantity Procurement To Be Do
12 Jun 2024
Tamilnadu Supply Of Sch-1-sl No -1- L15091fw26501001 Supply Of 2mm Vinyl Ester Based Glass Flake Lining Of Absorber Outlet Duct To Ggh Inlet Unit 1, Sch-1-sl No -2- L15091fw26501002 Application Of 2mm Vinyl Ester Based Glass Flake Lining Of Absorber Outlet Duct To
13 Jun 2024
Nagaland Carrying Out The Works Of Remote Operation Provision Of Ilsd System In Fire Pump House At Iocl Dimapur Bp
10 Jun 2024
Maharashtra Supply Of Ms Bin For Loading And Unloading Of Panto Base Insulator
Ms Bin For Loading And Unloading Of Panto Base Insulator As Per Attached Drawing. Material 1 No. Sample Piece Should Be Supplied For Inspection Before Bulk Quantity. This Material Sh

10 Jun 2024