Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Construction Of 6 Lane Flyover From Khapari Rob To Mihan Interchange And Upgradation Of Existing 4 Lps Road To 6 Lps With Service Road By Flexible Pavement In Section Of Nagpur - Hyderabad In The State Of Maharashtra On Epc Mode
Estimated Cost :4300400000
28 Jun 2024
Andhra Pradesh Construction Of Proposed Half Clover Leaf Interchanges Cum Rob At Yerramanchi And Gudipalli Villages Across Nh44 At Km 416.005 In The State Of Andhra Pradesh On Epc Mode Under Nh(o)
Estimated Cost :946300000
27 Jun 2024
West Bengal Clearing Of Congession From Sonai Khal And Sultanpur Khal By Removing Humps From Different Zones And Below Culverts Before And During Monsoon Period Within Dumdum, North Dumdum And Southdum Dum Municipality Dist North 24 Parganas Under Urban Draina
Estimated Cost :104926 INR
03 Jun 2024
Maharashtra Construction Of Proposed Rob (1x72.00m) In Lieu Of Lc No. Bk-25 "a Class (manned) At Km 11059/8-9 Between Btc-wri On Btc- Kge Section.
Estimated Cost :160862135 INR
18 Jun 2024
India S & T Work In Connection With Construction Of Lhs/rub In Lieu Of L.c.no. Rbk-14 Between Chaibasa-singhpohanria Stations.
Estimated Cost :2682086 INR
18 Jun 2024
Maharashtra Zone 9/b:- Virar-joravasan Section General Repairs, Painting Etc For Bridges In The Section Of Aden/ Bl From Km 145 To 212.
Estimated Cost :7970134 INR
14 Jun 2024
Maharashtra Zone 8/b:- Virar-joravasan Section :- General Repairs , Painting Etc., For Bridges In The Section Of Aden/ Drd I.e From Km 60.76 To Km 145.13.
Estimated Cost :7789334 INR
14 Jun 2024
India 3rd And 4th Line Between Jarapada And Talcher Road And Construction Of New Line Between Angul-balram Mcrl Inner Corridor Phase Doubling 14 Kms , Execution, Minor Bridges, Major Bridges, P Way Linking Work, Supply Of Ballast, Signal And Telecom Buildings,
Estimated Cost :3364491000 INR
18 Jun 2024
Maharashtra Signaling And Telecom Works In Connection With (1)ngp Divn:- Proposed Road Over Bridge (1x36.00m) In Lieu Of Lc No. Bk-02 "a" Class (manned) At Km 1045/5-6 Between Balaghat - Waraseoni Stations On Balaghat - Katangi Section(2) Ngp Divn:-proposed Rob (1x36
Estimated Cost :14850026 INR
11 Jun 2024
Tamilnadu Construction Of Bridge At Thirumakottai - Palaiyakottai - Palaiyur Road Km 5/8 Across Pamaniyar In Kottur Block Under Pmgsy Iii (2023 - 2024), Including 5 Years Maintenance, Tiruvarur District.package No.tn21414.
19 Jun 2024