Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Kerala Deposit Pmgsy Iii 2022-23 Kr 07-84-utility Shifting Of Existing 90mm Pvc Pipe By 90mm Pvc And 80mm Gi Pipe At The Culvert Portion Areas -ayamkudy-ezhumanthuruthu Road, Pipeline Work.
Estimated Cost :140302 INR
19 Jun 2024
Odisha Supply Of 1 - M6820320010 -diesel Portable Fire Pump 275 Lpm Is:942 Qty : 2
Estimated Cost :208475 INR
24 Jun 2024
Uttar Pradesh Soil Cleaning Work At Various Drain Km.
21 Jun 2024
Uttar Pradesh Supply Of 7 Mtr Gi Octagonal Pole Of Approved Make Top Dia 70 Mm Bottom Dia 130 Mm And Base Plate 12 Mm Thick, Aluminium Conductor Pvc Insulated Armoured Cable 1100 Volts, Led Street Light With Driver Set Suitable For 120 Watt Confirming Ip 66 Cat Aaa, Su
12 Jun 2024
Jammu & Kashmir Supply Of Two Leg Puller, Oil Filter Wrench 8 Inch Belt Type, Heavy Duty Nose Pliers Inner Outer, Electronic Regulator Tester, Clamp Meter, Stanley Cutting Pliers, Ac Tester, Screw Driver Set, Battery Capacity Tester Elak 100 175a - Tools Qty : 23
01 Jul 2024
Delhi Improvement To Storm Drain, Park, Boundary Wall, And Other Allied Works In The S/o Sse/w/s.p.marg Under Aden/e-ii.
Estimated Cost :8999982 INR
02 Jul 2024
Telangana Desilting Drain Through Engaging Private Labour And Machinery For Sanitation Maintenance In Various Places Of Vemulawada Municipality Under 15th Fc 2021-22 Untied Grants 5th Call
Estimated Cost :1711152 INR
20 Jun 2024
Rajasthan Annual Rate Contract For Repairing Of Of Handpump Under Sub Dn Pachpadra
Estimated Cost :500000 INR
18 Jun 2024
Rajasthan Construction And Commissioning Of 200mm Dia Tube Well Regar Basti Village Mothpur G.p Mothpur Block Atru District
Estimated Cost :499000 INR
19 Jun 2024
-Hose-Coupling-1"(mrep)-Lh-As-Per-Clw's-Spec.-No.-Clw/-Ms/3/001-(alt-16)-For-Ma-King-Mu(mr-Pipe)-Of-Wag-9-Locomotive.-[-Warranty-Period:-60-Months-After-The-Date-Of-Delivery-]"> Jharkhand -Hose-Coupling-1"(mrep)-Lh-As-Per-Clw's-Spec.-No.-Clw/-Ms/3/001-(alt-16)-For-Ma-King-Mu(mr-Pipe)-Of-Wag-9-Locomotive.-[-Warranty-Period:-60-Months-After-The-Date-Of-Delivery-]">Supply Of Hose Coupling 1"(mrep) Lh
Hose Coupling 1"(mrep) Lh As Per Clw's Spec. No. Clw/ Ms/3/001 (alt-16) For Ma King Mu(mr Pipe) Of Wag-9 Locomotive. [ Warranty Period: 60 Months After The Date Of Delivery ]

-Hose-Coupling-1"(mrep)-Lh-As-Per-Clw's-Spec.-No.-Clw/-Ms/3/001-(alt-16)-For-Ma-King-Mu(mr-Pipe)-Of-Wag-9-Locomotive.-[-Warranty-Period:-60-Months-After-The-Date-Of-Delivery-]">24 Jun 2024