Tenderskhoj
India
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Uttar Pradesh 400 KV GIS, 400kv Ais Work at Powergrid, Khavada Pooling Station-2
Etc Work That Includes Material Handling, Safe Keeping, Pre-erection Assembly, Erection, Testing, Pre-commissioning and Commissioning Including Trail Run of 400 Kv Gis, 400kv Ais Work at Powergrid, Khavada Pooling Station-2 (kp

Estimated Cost :19710280
27 Jun 2024
Maharashtra Construction of Entrance Gate Building and Development of its Surrounding Area at Landing jetty in JN Port
Estimated Cost :223002362
01 Jul 2024
Tamilnadu Improvements And Widening To The Road From Pudukkottai - Aranthangi Road To Muthuppattinam South Road In S Kullavaipatti Panchayat In Thiruvarankulam Block Of Pudukkkottai District.
Estimated Cost :4233000 INR
26 Jun 2024
Madhya Pradesh Decoration With Electric Series Lighting On The Auspicious Occasion Of Tapti Janmotsav 2024 At Various Places In Multai
Estimated Cost :325000 INR
25 Jun 2024
Himachal Pradesh Construction Of M/t On Fagu Bathaudhar Road Km. 0/0 To 10/00.
Construction Of 900mm Dia Rcc Hume Pipe Culvert Along With Both Side Wing Walls At Rd 5/330) Under Mnp.

Estimated Cost :372517 INR
26 Jun 2024
Jammu & Kashmir Improvement Upgradation Of Road From Fci To Narma Mohalla
Estimated Cost :1500000 INR
08 Jul 2024
Himachal Pradesh Construction Of Road From Dhatehar Mahrana Duhak Road Km. 0/0 To 6/310 #1 Formation Cutting, Passing Places, Retaining Walls, Cross Drainage Works, Gsb, Wbm-ii, Wbm G-lll, Tarring Work, Paver Block, Cement Concrete Pavement, Road Side Drain And Parapets &
Estimated Cost :36368000 INR
03 Jul 2024
Haryana Deeghot , Hari Ka Nangla , Group Of 2 No. Of Habitations Annual Mtc.works For Water Supply 1 Outsourcing Of Works/ Job Work For Cleaning Of Underground Tank Job Work For Desilting Of Under Ground Tank Complete In All Respect. / Aanganwadi Booster De
Estimated Cost :50000 INR
20 Jun 2024
Maharashtra Construction Of Godown And Machinery Shed.
Estimated Cost :23696000 INR
09 Jul 2024
Madhya Pradesh Supply Of 3 Pole Ab Switch 11 Kv, 200a, Lead Covered Immersion Heater, Rotary Encode 5v Analog 1vpp, Insulation Silicon Teflon Pad
Qty : 50

09 Jul 2024