Tenderskhoj
India
- Transportation Roads and highways
LOCATION SUMMARY DEADLINE
Karnataka Development Of Pedestrian Walkways In Major Road #1 Creation Of Nmt Infrastructure (pedestrian And Cycling Facilities) For Active Mobility.
Estimated Cost :80000000 INR
10 Jun 2024
Jammu & Kashmir Providing And Laying Of Gsb Wmm, Bm And Ogpc In Link Road To Dasepema Gongma And Yokma Choglamsar
Estimated Cost :5625000 INR
19 Jun 2024
Jammu & Kashmir Construction Of Link Road From Tsamskhang To Togochey House Nimoo ( Concrete Pavement Road ) ( Under Capex )
Estimated Cost :4273651 INR
06 Jun 2024
Jammu & Kashmir Construction Of Link Road From Stok To Agling Bridge Via Palam Village By Way Of Embankment Filling Rd 1815-3400
Estimated Cost :2469000 INR
18 Jun 2024
West Bengal Providing Of Facility Management Services - Lump Sum Based - Industrial; Making Of Brick Paver Block From Waste Plastic; Cost Of Consumable To Be Reimbursed To Service Provider On Actual. Qty : 1017207
Estimated Cost :1017207 INR
07 Jun 2024
Tamilnadu Supply Of Base For Electrically Operated Lifting Barrier Gate
Base To Drg.no.cwm 00908 Alt-2 For Electrically Operated Lifting Barrier Gate. W.o.no.23076205 [ Warranty Period: 12 Months After The Date Of Delivery ]

13 Jun 2024
Jammu & Kashmir Supply Of Over Flow Valve Rotarty And Fip Tata, Tape Insulation, Fuel Pipe, Fuel Pipe Transparent 1 5cm, Wire Dc 1mm, Wire Dc 4mm, Hose Clamp, Adaptor 6mm, Injector Washer Als Tata, Throttle Cleaner, Ether Capsule, Rust Remover, Hose Pipe Half Inch, Hose
18 Jun 2024
Tamilnadu Supply Of Switches And Leds For Operating Panel Of Eolbg
Switches And Leds For Operating Panel Of Electrically Operated Lifting Barrier Gate As Per The Enclosed Annexure-i.w.o.no.23076234 [ Warranty Period: 12 Months After The Date Of Delivery ]

11 Jun 2024
Rajasthan Tender For Taxi Hiring Service On Requirement Basis.
18 Jun 2024
India Rectification Works At Risk And Cost Of Contractor In Project Balance Work Of Four Laning Of Muzaffarnagar- Haridwar Section Of Nh-58 From Km. 131.360 (muzaffarnagar) To Km. 166.000 (start Of Roorkee Bypass) In The State Of Uttar Pradesh And Uttarakhand
27 Jun 2024