Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Tamilnadu Ot 49 Inspection Checking Esp B
Inspection Checking The Electrode Alignment Strengthening Of Collecting Plates Renewal Of Emitting Electrodes Shock Bars Plain Bearings In Esp B Pass Fields

01 Jul 2024
Chhattisgarh Supply Of Aph Seal Hot End Sector Plate, Grating For Ce Baskets Of Aph, Aph 27 5vitm2000 Taper Lock Bush And Ada, Aph 27 5vitm Radial Seal Pass A He And Ce, Aph 27 5vitm Radial Seal Pass B, Aph 27 5vitm Bypass Seal For He And Ce, Aph Seal Hot And Cold End
Estimated Cost :2842308 INR
26 Jun 2024
West Bengal Supply Of Design, Supply, Installation And Commissioning Of 70t Hydraulic System For Mounting And Dismounting Of Spherical Blocks Of Wheel Set Guide.
Design, Supply, Installation And Commissioning Of 70t Hydraulic System For Mounting And Dismounting

08 Jul 2024
Tamilnadu Supply Of Master Controller
Master Controller, Type: 9-mc-mu-d18 Medha Part No-sp648v24020 For 1600hp Demu Dpc. [ Warranty Period: 30 Months After The Date Of Delivery ]

21 Jun 2024
West Bengal Supply Of Procurement Of Items As Per Spec. Attached.
Details Specification Attached In Annexure- [ Warranty Period: 30 Months After The Date Of Delivery ]

20 Jun 2024
Gujarat Supply Of Set Of Hardware For Gear Case
Set Of Hardware For Gear Case Of Wap-7 Locomotives. Set Consists Of 08 Items In 528 Nos. As Per Sketch No. Els/aq/wag9/sk No. 0026 Rev-3. [ Warranty Period: 30 Months After The Date Of Delivery ]

25 Jun 2024
Tamilnadu Ot 48 Inspection Checking Esp A
Inspection Checking The Electrode Alignment Strengthening Of Collecting Plates Renewal Of Emitting Electrodes Shock Bars Plain Bearings In Esp A Pass Fields

01 Jul 2024
India Supply Of Split Air Conditioner Including Green Ac, Wall Mount Type (q2)
Qty : 2

24 Jun 2024
Uttarakhand Supply Of Split Air Conditioner Including Green Ac, Wall Mount Type (q2)
Qty : 2

24 Jun 2024
West Bengal Supply Of Step Assly For Wag-9hc Loco.
Step Assly For Wag-9hc Loco As Per Drg.no. 1209-06.242-008, Alt. 2. [ Warranty Period: 30 Months After The Date Of Delivery ]

11 Jul 2024