Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of Pantograph Base Insulator As Per Schunk Drg.no. 2-g01-15722 Or Object No. 1130041 Of Make Gipro For Schunk Make Pantograph (wbl.22.03) Confirming To Iec - 60060-1, En-50163: 2004 And En 50124-1:2001, Spec:iec-60060-1:2010 [ Warranty Period: 3
01 Jul 2024
Delhi Supply Of Arm Rest Complete For Lhb Ac Chair Car Coaches (pu Pad Of Green Colour). Drg. No. :- Judw/mech/14-649_rev.-1 [ Warranty Period: 30 Months After The Date Of Delivery ]
02 Jul 2024
Andhra Pradesh Construction Of Otm Complex For Indian Coast Guard At Muthukur, Spsr District, A.p. #1 Supply Installation Testing Commissioning Of Vrv/vrf Ac System In Administrative Building Otm Complex, Icgs Krishnapatnam
Estimated Cost :3052827 INR
03 Jul 2024
Uttar Pradesh Supply Of Set Of Metal Stop Lh & Rh For Lhb Bogies As Per Set List No. Mp22mslhrh Ver-0. Packing Instruction - Spi001 (sms). [ Warranty Period: 36 Months After The Date Of Delivery ]
02 Jul 2024
Madhya Pradesh Construction Of Emrs At Pushprajgarh Anuppur (m.p.) & Construction Of Emrs At Sohagpur Distt: (m.p.) #1 Structural Analysis And Design
Estimated Cost :884085 INR
19 Jun 2024
Tamilnadu Supply Of Modified Spring Loaded Oil Cover For Gear Case To Drg.no.- Elw/bsl/3/f65.045. [ Warranty Period: 30 Months After The Date Of Delivery ]
03 Jul 2024
Andhra Pradesh Supply Of Iron Wheel Skid To Rdso Specification
Iron Wheel Skid To Rdso Specification And Drawing. No. Tfc/spec/374/skid. Material: Mild Steel Or Spring Steel. [ Warranty Period: 30 Months After The Date Of Delivery ]

04 Jul 2024
Uttar Pradesh Supply Of Clip Assembly For Wheel Set Earthing Equipment As Per Drg. No. Lw 71240 Alt. Nil. Note - Material Isaccepted Only From Approved Sources (icf/rcf /rdso/mcf) Of Wheel Set Earthing Equipment. [ Warranty Period: 30 Months After The Date Of Deliv
02 Jul 2024
Karnataka Maintenance And Operation Of Electrical And Mechanical Services At Archaeological Survey Of India (asi) For The Year 2024-25. #1 Operation & General Upkeep Of Wet Riser And Afas.
Estimated Cost :1389496 INR
19 Jun 2024
Maharashtra Manufacturing And Supply Of Partially Fittings For Tws 1 In 12 60 Kg (t-6155)- Only Leaf Spring ( T-6310) [ Warranty Period: 30 Months After The Date Of Delivery ]manufacturing And Supply Of Partially Fittings For Tws 1 In 12 60 Kg (t-6155)- Only Wed
03 Jul 2024