Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Himachal Pradesh Repairs To Area Drainage Path Culvert And Hard Standing Including Plastering And Painting Services In Zone I And Zone Ii Under Age Br I At Under Ge Nagrota.
Estimated Cost :4990000 INR
18 Jun 2024
Goa Extension To The Existing Ramp For Polling Station No.43/51 Leveling Of Pathway, Cleaning Of Water Tanks Of Balanced P.s. And Internal Painting And Other Petty Works Of Various Polling Stations Under Usgao Panchayat Jurisdiction Of 19 - A.c.
03 Jun 2024
Uttarakhand Construction Of Two Lane Approach Road From Dwara Bridge (maldevta) To Dam Site (reach 0.300 To 10.300 Km) And Two Lane 60m Span Steel Bridge At Dwara (maldevta) For Song Dam Drinking Water Project In Block Raipur, Distt- .
Estimated Cost :448766075 INR
15 Jun 2024
Madhya Pradesh B.t. Renewal Of Adamgarh Bandrabhan Road In Km. 5. 1st Call, Pac Rs. 34.68 Lacs On Road And Bridge Sor 25.03.2022 (ammendment Upto Date), Completion Period 60 Days Ex/c Rainy Season.
Estimated Cost :3468000 INR
10 Jun 2024
Uttar Pradesh Construction Of Boundary Wall & Footpath Of Dr. Bhim Rao Ambedkar Park In Municipal Council, Ward No. 05 Saiyapurwa.
19 Jun 2024
Madhya Pradesh B.t. Renewal Of Approach Road Of Old Commissioner Office, Narmadapuram, Length 0.30 Km. 1st Call, Pac Rs. 11.09 Lacs On Road And Bridge Sor 25.03.2022 (ammendment Upto Date), Completion Period 30 Days Ex/c Rainy Season.
Estimated Cost :1109000 INR
10 Jun 2024
West Bengal Term Contract For Artificier Works Under Zone B At Bagrakote Stn Under Ge Sevoke Road.
Estimated Cost :500000 INR
19 Jun 2024
Jammu & Kashmir Supply Of Sub Soil Invetigation Submission Report At Gujran Nallah Km 50 750 On Dnbck Road As Per Drg In Atc, Sub Soil Invetigation Submission Report At Gujran Nallah Km 50 751 On Dnbck Road As Per Drg In Atc, Sub Soil Invetigation Submission Report At Gu
Estimated Cost :614631 INR
18 Jun 2024
Uttar Pradesh 3-(4) Numish Chauraha Usha Azency Se Ombeer Singh Kaushalpuri Ke Makan Tak Damar Road Construction Work
19 Jun 2024
Maharashtra Servicing Of Pa Fans, Id Fans, Fd Fans.
Supply Of Half Round Ss Shield For Boiler Tubes.
Supply Of Chemical Bonded And Firecreate Refractory.
Annual Work Contract For Rebabitting Of Worn Out Pillow Block Bearing Of Pa Fans.
Supply

Estimated Cost :4998000 INR
15 Jun 2024