Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Uttar Pradesh Tourism Development Of Premises. #* Upgradation Of Bus Stand. #* Link Road Street And Furniture Work. #* Temple Beautification Work. #* Tourist Development Work In Park And Other Places. #* Tourist Office Rising And Resident Maintenance Work. #hindi Image
Estimated Cost :22770000 INR
12 Jun 2024
Bihar Zonal Contract For All General Works, Wood Works, Road Work, Pipe Line & Sanitary Work For All Service Building At Central Super Speciality Hospital Under Aden/w/pnbe Of Zone No.17/2024-25.
Estimated Cost :6500000 INR
27 Jun 2024
Bihar Zonal Contract For All General Work, Pipe Line Sanitary, Wood Work & Road Work In Rajgir - Tilaiya Section For All Service Building And Quarters Under Aden/rgd Of Zone No.20/2024- 25.
Estimated Cost :5100000 INR
27 Jun 2024
Bihar Zonal Contract For All General Work, Wood Works, Road Works, Pipe Line & Sanitary Work At Danapur For All Service Building On South Side Of Railway Track And Drm Building, Hospital & Rest House Etc . Under Aden /hq/dnr Of Zone No.6/2024-25
Estimated Cost :3500000 INR
27 Jun 2024
Haryana Dorana Block: Ambala-i Panchayat: Dorana Annual Maintenance Work For Water Supply, Na Maintenance Of Roads Relaying Of Available (removed And Stacked) Interlocking Paver Block Pavement Having Thickness 100mm/80 Mm/ 60 Mm (average = 80mm) As Per Drawings A
Estimated Cost :43649 INR
10 Jun 2024
Kerala Capital Works At Lphep – 2024-25 – Re-metalling Of Lower Switch Yard (stage 2) And Associated Civil Works To Improve Earthing And To Avoid Vegetation Growth
Estimated Cost :3584517 INR
29 Jun 2024
Uttarakhand Renewal Of Namuna Santoshpur To Janta Farm Road Km 1 To 3 By Pc Under Annual Repair 2024-25
14 Jun 2024
India Independent Engineer Services For Construction Of Additional 3-lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh-922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode
11 Jun 2024
Uttarakhand Renewal Of Kripachayapur To Fika Nadi Via Hajiron Road Km 1 To 4 By Pc Under Annual Repair 2024-25
14 Jun 2024
Tamilnadu Resurfacing Of Bituminous Main Road In Anuvijay Township
Estimated Cost :8362625 INR
25 Jun 2024