Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Gujarat Design, Engineering, Procuring, Constructing & Commissioning (epc) For Rcc Intake Well Of 150 Mld Capacity At Nyari-1 Dam Site, Approach Bridge, Pump House & Ancillary Civil Works With Electro-mechanical Work Including Operation & Maintenance For Two Year
Estimated Cost :145343513 INR
08 Jul 2024
Madhya Pradesh Annual Patch Repair And Maintenance Of Roads, Bridges And Culverts Under Pwd Division No 1 Balaghat. Total Road Length 223.00
Estimated Cost :3000000 INR
26 Jun 2024
Himachal Pradesh Construction Of 72.00 Mtrs Span Composite Steel Grider Bridge On Mdr-66 (mdr Via Chotta Shimla) On Combermere Nallah Near Tourism Lift At Rd 149/030
21 Jun 2024
West Bengal Repair And Rehabilitation Of Amriti Bridge Km 10.700 And 2 Nos Box Bridge Km 9.985 And Km 14.955 Along Nh 131a Under Nh Division No Vii In The District West Bengal During The Year 2023 24 On Sbd Mode Job No. Nh 131a Wb 2023 24 544
Estimated Cost :5268515 INR
11 Jul 2024
West Bengal Repair And Rehabilitation Of Samsi Bridge At Km 20.850 And Kanua Bridge At Km 38.40 On Nh 31 Old Nh 81 Under Nh Division No. Vii In The District Of West Bengal During The Year 2023 2024 On Sbd Mode. Job No. Nh 81 Wb 2023 24 545
Estimated Cost :4144939 INR
11 Jul 2024
Kerala General-reconstruction Of Paliyam Kulikkadavu Bridge In Chennamangalam Grama Panchayath-investigation Work Investigation Work.
Estimated Cost :764125 INR
19 Jun 2024
Jammu & Kashmir Construction Of Balance Work Of Right Side Abutment Of Foot Suspension Bridge At Renam Zanskar.
Estimated Cost :1300000 INR
18 Jun 2024
West Bengal Consultancy Services For Supervision Of Construction Of Bow String Girder Type Minor Bridge At 16.567 Km Of Nh - 35 (new Nh- 112) Under Nh Divn No V P.w(rds) Dte During The Year 2022-23.2nd Call
28 Jun 2024
West Bengal Construction Of Culvert At Atghoria (activity Id - 67598200)
Estimated Cost :224793 INR
17 Jun 2024
Telangana Reconstruction Of 3v Of 3.0 M X 2.0 M Box Culvert On Dornakal-chandrugonda Road At Km 36/4-6 In Place Of Damaged Causeway, Reconstruction 2v Of 1.0 M Pipe Culvert At Km 28/6-8 In Place Of Damaged Pipe Culvert And Stone Pitching From Km 30/0 To 30/2( 40 Mt
Estimated Cost :10697118 INR
18 Jun 2024